7
Installation
IMPORTANT:
Careful consideration is required when choosing the location for the
machine, with regard to table movement, Mill/Drill Head movement and location of
power supply. Additionally, the workbench should be firm, flat and level. Avoid installing
in damp or very dusty locations and ensure that adequate light is provided.
Your new machine is delivered fully assembled (except for handles which are contained
in a bag of loose parts), and bolted to a board with four bolts. Various tools and
accessories are also contained in the bag of loose parts - see Fig.1.
To remove the machine from the case, carefully lay the carton on its side and break the
seal at the bottom. Fold the three flaps back and gently turn the carton so that it is upright.
Tilt the carton in order to fold back the remaining flap then lift the carton from the
machine and packing material.
Fig.1
1.
Double open ended spanner 8 - 10mm AF
2.
Double open ended spanner 14 - 17mm AF
3.
Double open ended spanner 17 - 19mm AF
4.
2 x ‘T’ nuts
5.
Set Hex. Wrenches. 3,4,5 & 6mm
6.
Drill Chuck w/taper shank
7.
Chuck Key
8.
3 x Levers/Handles
9.
Tommy Bar
10.
Draw bolt for taper shank
11.
Peg Spanner
12.
Open ended spanner - 36mm AF
13.
2 x handles for Wheel adjusters
14.
Oil Bottle
15.
Chuck Guard
Not shown: 1x Spare Fuse. 3Amp.
List of Loose Items
Summary of Contents for CMD300
Page 8: ...8 Parts Identification FIG A FIG B FIG C ...
Page 15: ...15 Parts Diagram ...
Page 16: ...16 Parts Diagram ...
Page 23: ...23 ...
Page 24: ......