background image

Summary of Contents for 7614051

Page 1: ...15 TONNE SHOP PRESS 15 TONNE SHOP PRESS MODEL No CSA15F Part No 7614051 OPERATING MAINTENANCE INSTRUCTIONS LS0609 ...

Page 2: ...al shall not be held liable to any damage to persons or equipment due to improper or non permitted use of the press GUARANTEE This CLARKE product is guaranteed against faulty manufacture for a period of 12 months from the date of purchase Please keep your receipt as proof of purchase This guarantee is invalid if the product is found to have been abused or tampered with in any way or not used for t...

Page 3: ... components Always apply the load on the centre of ram plunger Offset loads can damage the ram or ram mount and may cause work piece to be ejected Before operating check for signs of cracked welds bent bed pins loose or missing bolts or any structural damage Do not operate if any of these defects exist Have all repairs made by your Clarke dealer Remove all loads from work bed before attempting to ...

Page 4: ...ts 1 and two 12mm washers 3 See Fig 1 2 Fit two leg braces to each side as shown in Fig 3 and secure in place using M12x25 bolts 12 M12 nuts 1 and 12mm washers 3 Please pay attention to the way the leg braces have been fitted in Fig 2 For additional stability the press should be bolted to the ground You should drill through the base supports and use suitable bolts and washers not supplied to secur...

Page 5: ...re level and secured using the clevis pins supplied 25 4 Place the work bed 9 on to the support pins 10 as shown in Fig 4 5 Remove the pump assembly from the inside of the frame and reattach the pump assembly 17 to outside as shown in Fig 5 The pump assembly is supplied with a travel plug fitted Remove the travel plug Fit the vent plug supplied ...

Page 6: ...Setting the bed height 1 Remove any arbor plates 8 from the work bed 9 2 Hold the work bed securely with two hands and lift it off of the support pins Place the work bed carefully on the floor 3 Inserting the support pins 10 into the appropriate holes in the main frame at the required height Make sure that the support pins 10 are level and secured using the clevis pins supplied 25 4 Carefully plac...

Page 7: ...dle into either the high pressure or low pressure slots 5 Pump the handle slowly until the ram is close to or just touching the workpiece 6 Pump the handle slowly to apply pressure to the workpiece 7 When work is done stop pumping the handle Slowly and carefully turn the release valve anticlockwise to release pressure from the workpiece Note Always keep the ram retracted after use to avoid corrosi...

Page 8: ...ith a clean soft cloth Periodically check the frame to make sure all bolts are tight and inspect for cracked welds loose or missing parts Periodically check the hydraulic connections for possible leaks Replace damaged or leaking hydraulic components before use Periodically apply a light smear of oil to the moving parts and the work bed support pins At 6 monthly intervals check the hydraulic pump o...

Page 9: ...ON Rated specification 15 Tonnes Ram Travel E 130 mm Ram Diameter 65 mm Bed Width B 540 mm Bed Gap A 120 mm Bed to Ram Maximum C 930 mm Bed to Ram Stages D 100 mm Weight 125 5 kg Dimensions H 1865 x F 910 x G 605 mm ...

Page 10: ...10 EXPLODED PARTS DIAGRAM ...

Page 11: ...VICE CONTACTS PARTS LIST No Description Part No No Description Part No 1 NUTS M12 HTCSA1501 2 SPRING WASHER 12 HTCSA1502 3 WASHER 12 HTCSA1503 4 UPRIGHT BEAMS HTCSA1504 5 BOLT M12 x 55 HTCSA1505 6 PRESS HEAD ASSEMBLY HTCSA1506 7 FRAME HTCSA1507 8 ARBOR PLATE HTCSA1508 9 BED FLAT HTCSA1509 10 SUPPORT PINS HTCSA1510 11 SPREADER BAR HTCSA1511 12 BOLT M12 x 25 HTCSA1512 13 LEG BRACE HTCSA1513 14 BOLT ...

Page 12: ......

Reviews: