11
Parts & Service: 020 8988 7400 / E-mail: [email protected] or [email protected]
7. Screw a handle to each of the table cross feed and longitudinal feed
handle and secure with the locknuts provided.
8. If using the Drill chuck, attach the clear plastic chuck guard to its mount,
using the single screw provided.
9. Any preservative must be cleaned off thoroughly using a solvent, then
dried and a thin film of machine oil applied to all untreated surfaces. Take
great care when using the solvent, do not to allow it to get into the motor
or electrical components - switches etc.
10. Lightly lubricate all moving parts, handwheel threads etc., with machine
oil.
11. Check to ensure the post is secure by attempting to tighten the post
securing nut at the rear of the machine using the 36mm spanner provided.
Your Mill /Drill is now ready for use.
OPERATION
Ensure the work area is clean and tidy and all tools and accessories etc., are
removed and stored safely, before plugging the machine into the power
supply.
Switch the power on. The green indicator lamp on the switch panel on the
front of the machine will illuminate, indicating that power is being supplied to
the machine.
When first using the machine,
use the following procedure.
1. Select LOW range by
moving the lever, adjacent
to the Emergency Stop,
fully to the ‘L’ position.
2. Push the emergency OFF
switch cover button (fig.2)
upwards in direction of
arrow. This will allow the
cover to spring outwards,
releasing the OFF button.
3. Start the machine by turning the rotary ON/OFF, variable speed switch,
slowly clockwise to mid position and allow to run for a minute or two before
winding up to full speed, then allow to run for a further two minutes.
Summary of Contents for 7610860
Page 28: ......