Commissioning check-list
Direct Flush Accessible/Discreet
No Activity
1.
Flush pipework prior to installation.
2.
Ensure that the urinal bowl is suitable for mains flush or use the
D.C pipe interrupter.
3.
Check valve orientation: valve should be typically more than 500m from the urinal
(see installation instructions).
4.
Ensure water supply working/dynamic pressure is between 0.5 - 6 bar.
5.
Install an isolation valve upstream of solenoid valve.
6.
Check pipework from valve to urinal is appropriately sized and restriction free.
7.
Ensure a low restriction sparge is fitted.
8.
Check flow direction through valve.
9.
Check sensor is mounted in correct position (see installation instructions).
10.
Ensure label is removed from sensor before connecting power.
11.
Check electrical connections: sensor to solenoid, orange to orange, blue to blue.
Ensure mains power is connected, wire power adaptor to 1A fused spur.
12.
Check operation: adjust sensor range and flush time if necessary.
13.
Ensure flow rate through the valve is matched to the sparge to prevent water
coming out of the D.C pipe interrupter.
Checked
Date
16 |
www.
cistermiser
.co.uk
Product serial number
Installation address
Installer’s name
Telephone number
Email address
The warranty on Cistermiser products can be extended within one year of date
of manufacture, at no cost, to three years from the date of installation. Once
the valve has been installed, complete the product commissioning checklist
below to demonstrate compliance with the installation instructions. Email a
photograph of this completed form to
or post to
Cistermiser, Unit 1, Woodley Park Estate, 59-69 Reading Road, Woodley,
Berks, RG5 3AN.