![Cisco Network Convergence System 6000 Fabric Card Chassis Hardware Installation Manual Download Page 189](http://html.mh-extra.com/html/cisco/network-convergence-system-6000-fabric-card-chassis/network-convergence-system-6000-fabric-card-chassis_hardware-installation-manual_63785189.webp)
FCs are installed. The figure shows the 4+2 connections for two fabric plane. To complete the configuration,
you must repeat the cabling for the remaining four fabric planes until all 12 S2 cards are connected.
Figure 84: Cisco NCS 6000 Multi-Chassis 4+2 Configuration with 12 S2 FC
’
s
Cisco Network Convergence System 6000 Fabric Card Chassis Hardware Installation Guide
175
Cabling a Multi-Chassis Configuration
Multi-Chassis 4+2 Configuration