Index
230
Optical Receiver Module Diagram • 42
Optical Switch Module • 52
Optical Switch Module Description • 52
Optical Switch Module Diagram • 53
Optical Switch Operating Parameters • 53
optical transmitter module • 43
Optical Transmitter Module Descriptions • 43
Optical Transmitter Module Diagram • 44
Optical Transmitter Modules • 43
Optical Transmitter Setup Procedure • 101
Ordering Matrix • 13
Overview • 2, 58, 74, 82, 85, 122, 124, 127, 203
P
Passive Device and Bulkhead Mounting • 205
PCB • 220
Pedestal or Wall Mounting the Node • 72
Physical Description • 2
Poor C/N Performance • 144
Poor Distortion Performance • 146
Poor Frequency Response • 148
power distribution • 23
Power Distribution • 23
power supply module • 61
Power Supply Module • 61
Power Supply Module Description • 61
powering the node • 85
Preventative Maintenance • 124
Procedure • 69, 72, 77, 125
PROM • 220
Proper Fiber Routing • 204
PWB • 220
Q
QAM • 220
QPSK • 221
R
RCM • 221
RCVR • 221
Receiver Operating Modes • 173
Recommended Equipment • 134
Reconfiguring Forward Signal Routing • 103
Reconfiguring Reverse Signal Routing • 113
Removing and Replacing Modules • 127
Required Tools and Test Equipment • 66, 90
Reverse Balancing and Alignment Procedure •
190
Reverse Balancing the Node with EDR • 189
Reverse Band Amplification Path Description •
27
Reverse Configuration Module • 34
reverse configuration modules
configuration module replacement procedure
• 131
descriptions • 34
reverse path • 221
reconfiguring reverse signal routing • 113
reverse path setup procedures • 101
reverse path signal routing • 22
Summary of Contents for GS7000
Page 1: ...Cisco 1 2 GHz GS7000 Node Installation and Operation Guide ...
Page 2: ......
Page 7: ...Contents v Glossary 213 Index 225 ...
Page 8: ......
Page 19: ...Laser Warning Labels xvii ...
Page 20: ......
Page 34: ......
Page 38: ...Chapter 2 Theory of Operation 18 Left Right Segmented ...
Page 84: ...Chapter 2 Theory of Operation 64 1 1 EDR Transmitter 3 2 1 EDR Transmitter 7 ...
Page 96: ...Chapter 3 Installation 76 ...
Page 108: ......
Page 112: ...Chapter 4 Setup and Operation 92 Left Right Segmented ...
Page 116: ...Chapter 4 Setup and Operation 96 Right side Ports 4 5 and 6 illustration ...
Page 143: ...Opening and Closing the Housing 123 ...
Page 158: ......
Page 172: ......
Page 232: ...Appendix C Expanded Fiber Tray 212 ...
Page 244: ......
Page 253: ......