Applying Power to the Node
87
1
Use a true-rms DVM to check for 45 to 90 V AC input voltage at the AC test point
on the power supply module.
2
Check for the various DC output voltages (+24.5, +8.5, -6.0, and +5.5) of the
power supply at the DC test points on the power supply module.
3
Verify that the Power ON LED on the receiver module is on.
4
Carefully close the housing lid. See
Opening and Closing the Housing
(on page
Summary of Contents for GS7000
Page 1: ...Cisco 1 2 GHz GS7000 Node Installation and Operation Guide ...
Page 2: ......
Page 7: ...Contents v Glossary 213 Index 225 ...
Page 8: ......
Page 19: ...Laser Warning Labels xvii ...
Page 20: ......
Page 34: ......
Page 38: ...Chapter 2 Theory of Operation 18 Left Right Segmented ...
Page 84: ...Chapter 2 Theory of Operation 64 1 1 EDR Transmitter 3 2 1 EDR Transmitter 7 ...
Page 96: ...Chapter 3 Installation 76 ...
Page 108: ......
Page 112: ...Chapter 4 Setup and Operation 92 Left Right Segmented ...
Page 116: ...Chapter 4 Setup and Operation 96 Right side Ports 4 5 and 6 illustration ...
Page 143: ...Opening and Closing the Housing 123 ...
Page 158: ......
Page 172: ......
Page 232: ...Appendix C Expanded Fiber Tray 212 ...
Page 244: ......
Page 253: ......