Procedure
Procedure
Step 1
Remove any installed service modules, blank faceplates, and slot adapters from the router slot that you plan
to use.
Step 2
Loosen the retention screw on the front of the slot divider.
Step 3
Pull the slot divider straight out of the module slot.
What to do next
What to Do Next
Install the E-Series Server into the router. See the “Installing the E-Series Server or the SM E-Series NCE
into the Router”.
Installing the E-Series Server or the SM E-Series NCE into the Router
E-Series Servers or the SM E-Series NCE can be installed either before or after mounting the router, whichever
is more convenient.
Only trained and qualified personnel should be allowed to install, replace, or service this equipment. Statement
1030
Danger
To avoid electric shock, do not connect safety extra-low voltage (SELV) circuits to telephone-network voltage
(TNV) circuits. LAN ports contain SELV circuits, and WAN ports contain TNV circuits. Some LAN and
WAN ports both use RJ-45 connectors. Use caution when connecting cables. Statement 1021
Danger
Hazardous network voltages are present in WAN ports regardless of whether power to the unit is OFF or ON.
To avoid electric shock, use caution when working near WAN ports. When detaching cables, detach the end
away from the unit first. Statement 1026
Danger
To prevent damage to the server, handle the server by the chassis or frame.
Caution
Before You Begin
Verify that you have done the following:
1.
Removed the blank faceplates from the slots that you intend to use. See the “Removing the Blank Faceplate
from the Router’s SM Slot”.
2.
Saved the blank faceplates for future use.
Cisco UCS E-Series Servers and the Cisco UCS E-Series Network Compute Engine Hardware Installation Guide
29
Installing the E-Series Server or the SM E-Series NCE into the Router