OL-29163-01
37
Introduction
This section describes the behavior of the front panel indicators when
the Residential Gateway is first powered up, during normal
operations, and in special conditions.
4
Chapter 4
Operation of Front Panel
Indicators
In This Chapter
Initial Power Up, Calibration, and Registration (AC Power
applied) ...............................................................................................38
Normal Operations (AC Power Applied) ........................................40
Special Conditions..............................................................................41