Figure 30: Top Cover and Base Cover
10-32 or 12-24 pan head screws
1
Establishing System Ground
To attach the grounding lug and cable to the grounding pad, perform these steps:
Cisco Catalyst 9600 Series Switches Hardware Installation Guide
57
Installing the Switch
Establishing System Ground