200 V Redundant Power Feed Configuration (single power feed, redundant power feed) 
with Power Distribution Box Connection 

It is necessary to arrange four PSUs, two FANUs, four Power cables (200 V IEC60320 C20) and two power 
distribution boxes (200 V IEC60320 C19×3type) for 200 V Redundant Power Feed configuration (with single 
power feed, redundant power feed). 
When the power distribution box is used, it is necessary to secure the breaker characteristic of distribution 
panel. See “

2.5 Cutoff Characteristics of Distribution Panel (At the time of connecting power distribution box)

.” 

 

FIGURE 2.10 200 V Redundant Power Feed Configuration (single power feed, redundant power feed) with 

Power Distribution Box Connection 

 

Number 

Description 

(1) 

Power distribution box (200V C 19 

 3 type) 

 

 

 

Summary of Contents for C880 Series

Page 1: ...Cisco C880 M4 Server Hardware Installation Manual for Servers with E7 8800 v2 v3 and v4 CPUs March 2017 ...

Page 2: ...PLIERS DISCLAIM ALL WARRANTIES EXPRESSED OR IMPLIED INCLUDING WITHOUT LIMITATION THOSE OF MERCHANTABILITY FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT OR ARISING FROM A COURSE OF DEALING USAGE OR TRADE PRACTICE IN NO EVENT SHALL CISCO OR ITS SUPPLIERS BE LIABLE FOR ANY INDIRECT SPECIAL CONSEQUENTIAL OR INCIDENTAL DAMAGES INCLUDING WITHOUT LIMITATION LOST PROFITS OR LOSS OR DAMAGE TO DATA A...

Page 3: ...ternal interface connection 9 2 2 Power cable connection 14 2 2 1 Power Cables Connections 14 2 3 Connection Specifications of Input Power 17 2 3 1 Input Power Connection Specifications Base Cabinet 17 2 3 2 Power Distribution Box and Distribution Panel 17 2 4 Free Access Underfloor Connection of Power Cable 18 2 5 Cutoff Characteristics of Distribution Panel At the time of connecting power distri...

Page 4: ... 8 CPU Maximum 4 IOU are available Remarks Each device shown in TABLE 1 1 Name and Contents of Configuration of Each device is installed in 19 inch rack of EIA standard For the details on 19 inch rack contact the distributor where you purchased your product or your sales representative 1 2 External Overview of Device This section describes the external overview of device 1 2 1 External Overview of...

Page 5: ...2 FIGURE 1 2 Cisco C880 Server E7 8800 v2 CPU front view FIGURE 1 3 Cisco C880 Server rear view ...

Page 6: ...3 FIGURE 1 4 Cisco C880 Server top view FIGURE 1 5 Cisco C880 Server right side view ...

Page 7: ...e seismic wave Downtime 9 10 0 1000 Composite seismic wave Permissible dust level mg m3 0 15 Power supply conditions Input voltage and source resultant pulse number 200 to 240 VAC 10 1φ Frequency and fluctuating Range 50 60 Hz 2 4 Max power consumption apparent power At the time of operation Interruptible power source 13 6 00 kW 6 19 kVA 5 52 kW 5 69kVA High efficiency power supply 13 5 81 kW 5 99...

Page 8: ...F Error of 100m in the sea level settings of the location of installation is permissible 6 Downtime is the condition in which the device is packed and maintained 7 Level of noise which is actually heard varies as per the mounting condition of the position from where the noise is heard or the position of rack 8 Level of noise and the level of acoustic power changes according to the Hardware configu...

Page 9: ...installed 19 inch rack For details on the 19 inch racks contact the distributor where you purchased your product or your sales representative FIGURE 1 6 Service Area at the time of installing 19 inch rack model Number Description 1 Rear side maintenance area 2 Rack 3 Front side maintenance area 4 Rack width Model 2724 2737 2742 PCRM1 724S 742S 724A 742A 700 mm Model 2616 2624 2642 PCRM1 616S 624S ...

Page 10: ...nstallation of a device If device is installed without considering them it may get affected by inhaling the exhaust air from the other device Especially the device detecting the intake air temperature may raise alarm indicating abnormality 1 5 1 Flow of Cooling Air and Exhaust Air Main Cabinet FIGURE 1 7 Flow of Cooling Air and Exhaust Air Main Cabinet Number Description 1 Inspiration 2 Exhaust 3 ...

Page 11: ...uld be removed by providing suitable air cleaning equipment In addition positive clear air pressure in the room prevents an entering of the corrosive gas from the outside The chemical factory area thermal water volcanic zone etc are considered as a source of corrosive gas TABLE 1 3 Permissible Level of Corrosive Gas Name of gas Permissible level Hydrogen sulfide H2S 7 1ppb or less Sulfur dioxide S...

Page 12: ...his section describes the notes for connection of signal cable cable list and cable procure 2 1 1 Details of external interface connection Mounting position of external interface connecting part of Cisco C880 Server is shown in the section below When calculating the length of the connection cable you should take account into the mounting position ...

Page 13: ...ection figure of Cisco C880 Server E7 8800 v3 and E7 8800 v4 CPUs in base cabinet is shown in the section below This figure is uncovered front surface face The front cover must be attached in normal operation FIGURE 2 1 External interface connection figure of Cisco C880 Server E7 8800 v3 and E7 8800 v4 CPUs Front surface ...

Page 14: ...rface connection External interface connection figure of Cisco C880 Server E7 8800 v2 CPU in base cabinet is shown in the section below This figure is uncovered front surface face The front cover must be attached in normal operation FIGURE 2 3 External interface connection figure of Cisco C880 Server E7 8800 v2 CPU Front surface ...

Page 15: ...ction figure of Cisco C880 Server E7 8800 v2 CPU Back surface Details of external interface MMB FIGURE 2 5 Details of external interface MMB Details of external interface IOU_1GbE IOU_10GbE FIGURE 2 6 Details of external interface IOU_1GbE ...

Page 16: ...13 FIGURE 2 7 Details of external interface IOU_10GbE Details of external interface DU FIGURE 2 8 Details of external interface DU ...

Page 17: ... PSUs three FANUs three power cables 200 V IEC60320 C20 and two power distribution box 200 V IEC60320 C19 3type for 200 V standard configuration When the power distribution box is used it is necessary to secure the breaker characteristic of distribution panel See 2 5 Cutoff Characteristics of Distribution Panel At the time of connecting power distribution box FIGURE 2 9 200V Standard Configuration...

Page 18: ...ant Power Feed configuration with single power feed redundant power feed When the power distribution box is used it is necessary to secure the breaker characteristic of distribution panel See 2 5 Cutoff Characteristics of Distribution Panel At the time of connecting power distribution box FIGURE 2 10 200 V Redundant Power Feed Configuration single power feed redundant power feed with Power Distrib...

Page 19: ...ed configuration When the power distribution box is used it is necessary to secure the breaker characteristic of distribution panel See 2 5 Cutoff Characteristics of Distribution Panel At the time of connecting power distribution box FIGURE 2 11 200 V Dual Power Feed Configuration with Power Distribution Box Connection Number Description 1 Power distribution box 200V C 19 3 type AC 0 2 Power distr...

Page 20: ...ce and power cord supplied with the option part are used for the power cable which is connected to the device However the supplied power cable is not used for the other products Power distribution box which is suitable to recipient power distribution format is used 2 3 2 Power Distribution Box and Distribution Panel Following table shows the power supply cable specifications of power distribution ...

Page 21: ...2 13 When the under floor height is 300 mm 11 8 in or more Number Description 1 Free access floor 2 200 mm 9 8 in 3 300 mm 11 8 in or more 4 Recipient power distribution Remarks The above figure shows an example of 19 inch rack mounted with the device 2 5 Cutoff Characteristics of Distribution Panel At the time of connecting power distribution box At the time of connecting the distribution panel t...

Page 22: ...30A 32A Cutoff characteristic is Long time delay type and the cutoff characteristic equivalent to D IEC898or IN0641 part II shown in FIGURE 2 14 Characteristics of Breaker of Distribution Panel or cutoff characteristics slower than these characteristics is used FIGURE 2 14 Characteristics of Breaker of Distribution Panel Number Description 1 Operating time 2 Minutes 3 Seconds 4 Electric current Am...

Page 23: ...the mounting racks for the Cisco C880 Server Remarks Equipment is not lifted by the handle attached to the main part equipment right and left side Please remove the steering wheel by minus driver before installing the device in the rack installing to the rack ...

Page 24: ...1 Length of rack Check3 Length between front post and front cover 60mm 2 4 in or more FIGURE A 1 Length of rack Width of rack Check4 distance between the left and right posts common to the front and rear posts 450mm 17 7 in or more FIGURE A 2 Width of rack FIGURE A 3 Format of rack posts Check5 Distance between holes on the left and right device mounting posts common to the front and rear posts 46...

Page 25: ...2 Front post 3 Rear post 4 Rear cover Width of rack FIGURE A 2 Width of rack Number Description 1 Front cover 2 Front post 3 Rear post 4 Rear cover 5 Bracket installation area 6 Width of Bracket installation 7 Width of chassis of Cisco C880 Server 8 Chassis of Cisco C880 Server ...

Page 26: ... in 1 3 Installation Specifications Especially cover the front of empty spaces in the rack and take other such necessary measures to prevent exhaust air from devices from recirculating to the air intake Securing the maintenance work area service area Secure the service area required for the maintenance work performed by a certified service engineer Referring to the rack service areas in 1 4 Instal...

Page 27: ... Mounting Location in 19 inch Rack C880 M4 mounting conditions are The bottom of the unit is higher than 2U from rack base The bottom of the unit is lower than 1060 mm from floor FIGURE B 1 Mounting Location in 19 inch Rack Example 1 Example 2 ...

Page 28: ...4 cabinet in the rack 8 Securing the C880 M4 cabinet with screws B 3 Confirming the components of the rail kit TABLE B 2 shows components of the rail kit Please confirm the components TABLE B 2 Components of the rail kit Name Drawing No Qty Remarks RAIL LEFT SNP A3C40122926 1 See Figure B 2 RAIL RIGTH SNP A3C40124429 1 BINDER SNP A3C40108821 2 M5 screw with plug washer SNP A3C40063207 6 CENTERING ...

Page 29: ...ide rail to the rear rack post by using three centering screws 6 As 7 in FIGURE B 5 shows fasten the left side rail to the front rack post by using three of M5 screw with plug washers 7 Tighten the screw 8 in FIGURE B 5 and adjust its length 8 B in FIGURE B 4 shows use two centering screws and fasten binder on the rear rack post 9 Similarly install the right rail and mounting binder 10 As 2 in FIG...

Page 30: ...27 FIGURE B 4 Position to install rail rear side FIGURE B 5 Left side rail ...

Page 31: ...28 FIGURE B 6 Four knob screws on the front side of C880 M4 cabinet ...

Reviews: