5.2.- PREPARATION OF FOOTINGS
MAX
10º
300mm
MAX
D
D
CASKET
REINFORCED
TWIN-LAYER PIPE
-PROJECTION OF A LENGTH OF 6 M APPROXIMATELY FROM CASKET SPLICE FOR THE
LOWERING OF STRINGS, DC WIRING.
-IF IT IS ONLY FOR AC WIRING OF THE CHARGER, PROJECTION OF 4 M APPROXIMATELY
OF CASKET SPLICE.
LEAVE CABLES IN
PLACE
CASKET
FOOTING
FOOTING ALIGNMENT
SPLICE BOX
Figure 8: Preparation of footings�