5�1�3�- MAJOR INSTALLATION
Lowering of strings (DC wiring) per start and central foot.
Power supply of recharging points in each foot. (AC wiring)
Figure 7: Major installation�
5�1�4�- INTERNAL CONNECTION OF FEET
WING-STRAP
FOOT-WING
GROUND-FOOT
(SEE DETAILS IN
POINT 7.4)
Figure 8: Internal connection of feet�
16
PVS2, PVS2-R
Installation Guide