5.- PREPARATION OF THE INSTALLATION
5�1�- STUDY INTO THE ELECTRICAL PROJECT
5�1�1�- STANDARD INSTALLATION WITH RECHARGE POINT IN START FOOT
Lowering of strings (DC wiring) per start foot.
Power supply to recharging point in start foot (AC wiring).
Figure 5: Standard installation with recharging point in start foot�
5�1�2�-STANDARD INSTALLATION WITH RECHARGE POINT IN START AND END FOOT
Lowering of strings (DC wiring) per start foot.
Power supply to recharging point in start and end foot (AC wiring).
Figure 6: Standard installation with recharging point in start and end foot�