5.2.-
PREPARATION OF FOOTINGS
MAX
10º
300mm
MAX
D
D
CASKET
REINFORCED
TWIN-LAYER PIPE
-PROJECTION OF A LENGTH OF 6 M APPROXIMATELY FROM CASKET SPLICE FOR THE
LOWERING OF STRINGS, DC WIRING.
-IF IT IS ONLY FOR AC WIRING OF THE CHARGER, PROJECTION OF 4 M APPROXIMATELY
OF CASKET SPLICE.
LEAVE CABLES IN
PLACE
CASKET
FOOTING
FOOTING ALIGNMENT
SPLICE BOX
Figure 8: Preparation of footings�
14
PV2
Installation Guide
Summary of Contents for PV2 Series
Page 1: ...INSTALLATION GUIDE M233A01 03 18A Canopies PV2...
Page 2: ...2 PV2 Installation Guide...
Page 33: ...9 FINAL FOUNDATIONS Concrete Hormig n Figure 30 Final foundations 33 Installation Guide PV2...
Page 34: ...10 INSTALLATION OF THE CHARGER Figure 31 Installation of the charger 34 PV2 Installation Guide...