CIRCONTROL, S.A.
– Innovació, 3 – 08232 – Viladecavalls (Barcelona)
Tel.: +34 937 362 940
– Fax: +34 937 362 941
10
Web: www.circontrol.com
– E-mail:
INSTALLATION MANUAL
–CCL-PT3 SMART & CCL-PT3 SMART 3G–
2
Once the four “L” threaded bars are undergrounded, the metal template must
be mounted, as shown in the image, in order to get the bars completely
aligned.
3
When dry,
remove the template
, and keep the four nuts that must be
lowered close to the floor level.
4
Insert the main fixing structure through the lower holes.
ATTENTION!!
: Be careful with the position of the base (BACK & FRONT)
due is not symmetrical.
FRONT VIEW