![background image](http://html.mh-extra.com/html/cipelletti/vapor-pro-c140/vapor-pro-c140_operation-manual_2607684006.webp)
5
ENGLISH
Safety cap
Wand seat
Iron button with red led
Boiler button with red led
Low water light indicator
Iron plate temperature regulating knob
Steam button
1
2
3
4
5
6
7
COMPONENTS
USER INSTRUCTIONS
Remove the ironing machine from its packing and make sure all packing parts
have been taken off (including the protection bags). Lay the machine on a flat
and steady surface fitted to support it next to a wall socket (max. mt. 1,5).
It is recommended to lay the iron on the supplied pad.
Insert in the right seat (2) the supplied wand to hold the hose up and hook it
with the spring up to the iron-boiler connecting wire.
Unscrew the safety cap (1) and let the internal air out. Fill the boiler with max.
1,1 litres of water
Use the funnel supplied, making sure you do not overfill the tank.
Close the safety cap (1).
Insert the plug into the main supply point; switch on boiler (4) and iron button
(3). If the two buttons come on, iron and boiler are working.
1
2
3
4
5
6
Summary of Contents for vapor pro C140
Page 1: ......
Page 17: ...16 ESPLOSO BLOW UP DIAGRAM VUE CLAT E ZEICHNUNG...
Page 18: ...17 SCHEMA ELETTRICO WIRING DIAGRAM CIRCUIT ELECTRIQUE SCHALTPLAN...
Page 20: ......