CV
-
100
-
P2100 Series | User Manual
108
6.3 Installing a PoE Module
1.
Place a thermal pad on the top of the heatsink, and locate the two regions as marked.
2.
Turn over the heatsink and paste the thermal pad at the marked region.
3.
Paste the thermal pad onto the coil of the CFM-PoE module.
4.
Locate the PoE connector on system motherboard as indicated.
Before putting on the thermal block, please make sure the
protective film on the Thermal Pad has been removed!
CAUT
IO
N
Summary of Contents for CV-100-P2100 Series
Page 18: ...CV 100 P2100 Series User Manual 18 Chapter 1 Product Introductions ...
Page 23: ...CV 100 P2100 Series User Manual 23 Dimensions CV 112 P2102 CV 112 P2102E ...
Page 25: ...CV 100 P2100 Series User Manual 25 Dimensions CV 115 P2102 CV 115 P2102E ...
Page 27: ...CV 100 P2100 Series User Manual 27 Dimensions CV W115 P2102 CV W115 P2102E ...
Page 29: ...CV 100 P2100 Series User Manual 29 Dimensions CV 117 P2102 CV 117 P2102E ...
Page 39: ...CV 100 P2100 Series User Manual 39 Chapter 2 Switches Connectors ...
Page 49: ...CV 100 P2100 Series User Manual 49 Chapter 3 System Setup ...
Page 73: ...CV 100 P2100 Series User Manual 73 ...
Page 75: ...CV 100 P2100 Series User Manual 75 Chapter 4 BIOS Setup ...
Page 94: ...CV 100 P2100 Series User Manual 94 Chapter 5 Product Application ...
Page 97: ...CV 100 P2100 Series User Manual 97 ...
Page 104: ...CV 100 P2100 Series User Manual 104 Reference Input Circuit Reference Output Circuit ...