14
1. START ENGINE:
A) Turn key on engine control to
“ 1”.
B) Allow 3-5 seconds to heat glow plugs (Flashing
green light will turn to solid green).
C) Turn key to
“ 2”.
D) Release when engine starts.
MA4 Start Up Procedure
LOAD FRESH SEALANT MATERIAL INTO TANK:
All sealant material must be clean. Keep all foreign
matter out of melting tank to avoid damage to pump and
systems.
1) Open the material door (A) and place the block of sealant
material (B) on the open door against the holder (C).
2) Push door to the closed position.
TO PREVENT CONTACT WITH HOT SEALANT DO
NOT DROP MATERIAL INTO THE MELTER WITH
EITHER OR BOTH DOORS OPEN.
LOADING OPERATOR MUST WEAR ALL
PROTECTIVE CLOTHING COVERED ON PAGE 4.
LOAD MATERIAL FROM GROUND ONLY. NEVER
CLIMB ON THE TRAILER TO LOAD.
2. VERIFY SWITCHES ON CONTROL PANEL:
A) Verify main control switch inside control box is set
to “AUTO”.
B) Verify ALL the switches inside the control box are
in their left most position.
3. POWER UP CONTROL PANEL:
A) Set control panel rotary switch on front (outside)
of control box to the “RUN” position.
WARNING