- 6 -
Operating Sequence
Diesel Units
NOTE: This step by step procedure is only an outline. Refer to the page(s) indicated
for complete instructions.
PROCEDURE:
PAGE
1)
Refer to fuel system air bleeding before starting.
12
2)
Start engine per engine operating instructions.
14
3)
Set temperature controller(s).
16
4)
Make sure tank outlet, sealing hose, and air cleanout valves are closed.
10-11
5)
Open Thermal Regulating Gate if cabinet heating is required.
17
6)
Ignite burner.
16
7)
Allow oil temperature to reach approximately 250º F.
8)
Regulate cabinet temperature.
17
9)
Start agitation.
19
10)
Add material, typically 2-3 biscuits if tank is empty.
19
11)
Allow for sufficient melting.
20
12)
Start material pump.
20
13)
Close Thermal Regulating Gate.
17
14)
Attach sealing wand extension and adjust flow.
20-21
15)
Begin sealing procedure.
20-21
16)
10-15 minutes before the end of the work day, return temperature
24
control knobs to zero.
17)
Clean out melter.
24-26