CE318-T Photometer
User Operation Manual
Revision V4.10 October 2021
19
Robot and sensor head mounting
10.
Put the screws into white plastic part.
11.
Put the screws on the holes through the robot base
but don’t tight them
to the end, let a 2 or 3 cm backlash so that the levelling that is done in
the next part is easier to do.
12.
Connect AZ (robot AZimuthal motor), ZN (robot Polar motor), solar panel,
and wet sensor and battery wires to the removable terminal block of the
CU passing them going through the cable glands of the protection case.
Summary of Contents for CE318-T
Page 1: ...Multiband photometer CE318 T User s Manual rev October 2021...
Page 79: ...CE318 T Photometer User Operation Manual Revision V4 10 October 2021 78...
Page 80: ...CE318 T Photometer User Operation Manual Revision V4 10 October 2021 79...
Page 81: ...CE318 T Photometer User Operation Manual Revision V4 10 October 2021 80...
Page 82: ...CE318 T Photometer User Operation Manual Revision V4 10 October 2021 81...
Page 83: ...CE318 T Photometer User Operation Manual Revision V4 10 October 2021 82...
Page 84: ...CE318 T Photometer User Operation Manual Revision V4 10 October 2021 83...
Page 85: ...CE318 T Photometer User Operation Manual Revision V4 10 October 2021 84...