SERVICE MANUAL
Transmig 165
ST
Transmig 165
ST
SERVICE MANUAL
Transmig 165
ST
Transmig 165
ST
Manual 0-5442
10-7 TROUBLESHOOTING
10.09 Check main On / Off Switch
23
24
25
26
Art # A-13007
Power Switch Testing
Multimeter Lead Placement
Impedance
Switch ON
Positive meter lead to testpoint 23
Negative meter lead to testpoint 24
0 to 1 Ω
Switch ON
Positive meter lead to testpoint 25
Negative meter lead to testpoint 26
0 to 1 Ω
Switch OFF
Positive meter lead to testpoint 23
Negative meter lead to testpoint 24
> 1k Ω
Switch OFF
Positive meter lead to testpoint 25
Negative meter lead to testpoint 26
> 1k Ω
Table 10-8 Power Switch, Multimeter set to measure ohms (Ω)
10.10 Check main input rectifier
Input Rectifier Testing
Multimeter Lead Placement
Diode Voltage
AC1 to DC+
Positive meter lead to AC1
Negative meter lead to testpoint DC+
0.2 – 0.8 VDC
AC2 to DC+
Positive meter lead to AC2
Negative meter lead to testpoint DC+
0.2 – 0.8 VDC
AC1 to DC-
Positive meter lead to testpoint DC-
Negative meter lead to testpoint AC1
0.2 – 0.8 VDC
AC2 to DC-
Positive meter lead to testpoint DC-
Negative meter lead to testpoint AC2
0.2 – 0.8 VDC
Table 10-9 IGBT’s, Multimeter set to measure Diode Voltage
Measurements may be made directly onto the main input rectifier. AC1 and AC2 may be measured from the
pins on the mains supply plug with the main power switch set to the ON position.
Summary of Contents for Transmig 165ST
Page 16: ...SERVICE MANUAL Transmig 165ST Transmig 165ST GENERAL INFORMATION 1 10 Manual 0 5442 Notes ...
Page 32: ...OPERATION 4 6 Manual 0 5442 SERVICE MANUAL Transmig 165ST Transmig 165ST Notes ...
Page 84: ...SERVICE MANUAL Transmig 165ST Transmig 165ST THEORY OF OPERATION 9 2 Manual 0 5442 Notes ...
Page 120: ...SERVICE MANUAL Transmig 165ST Transmig 165ST ASSEMBLY PROCEDURE 12 8 Manual 0 5442 Notes ...
Page 125: ...SERVICE MANUAL Transmig 165ST Transmig 165ST This Page Intentionally Blank ...