PART II: INSTALLATION
11
2.10
2.12
MOUNTING AND CONNECTING THE BURNER
Fitting the burner to the boiler
To install the burner into the boiler, proceed as follows:
1
make a hole on the closing door of the combustion chamber as described on paragraph “Overall dimensions”)
2
place the burner to the boiler: lift it up and handle it according to the procedure described on paragraph “Handling the burner”;
3
place the 4 stud bolts (5) on boiler’s door, according to the burner drilling template described on paragraph “Overall dimensions”;
4
fasten the 4 stud bolts;
5
place the gasket on the burner flange;
6
install the burner into the boiler;
7
fix the burner to the stud bolts, by means of the fixing nuts, according to the next picture.
8
After fitting the burner to the boiler, ensure that the gap between the blast tube and the refractory lining is sealed with appropriate
insulating material (ceramic fibre cord or refractory cement).
The burner is designed to work positioned according to the picture below. For different installations, please contact the Technical
Department.
Note: the figure is indicative only.
2.11 Packing
The burners are despatched in wooden crates whose dimensions are:
series 9x: 1672mm x 1072mm x 1016mm (L x P x H)
Packing cases of this type are affected by humidity and are not suitable for stacking.
The following are placed in each packing case:
z
burner with detached gas train;
z
gasket or ceramic fibre plait (according to burner type) to be inserted between the burner
and the boiler;
z
envelope containing this manual and other documents.
To get rid of the burner’s packing, follow the procedures laid down by current laws on disposal
of materials.
PART II: INSTALLATION
H
P
L
Keys
1
Burner
2
Fixing nut
3
Washer
4
Sealing gasket
5
Stud bolt
7
Blast tube
SIDE UP
SIDE DOWN
Summary of Contents for Low NOx Series
Page 33: ...PART IV MAINTENANCE 33 ...
Page 35: ......