15 - UNIT START-UP CHECKLIST FOR INSTALLERS PRIOR TO CONTACTING
THE MANUFACTURER
(USE FOR MACHINE FILE)
Preliminary information
ob name:.............................................................................................................................................................................................
Location: .............................................................................................................................................................................................
Installing contractor: ...........................................................................................................................................................................
Distributor: ..........................................................................................................................................................................................
Commissioning performed by: ................................................... Date:
..........................................................................................
Equipment
AQUACIAT
POWER
ILD ST / HE model: ....................................... Serial number .............................................................................
Compressors
Circuit A
Circuit B
1. Model # ................................................................................ 1. Model # ................................................................................
Serial number ......................................................................
Serial number ......................................................................
2. Model # ................................................................................ 2. Model # .................................................................................
Serial number ......................................................................
Serial number ......................................................................
3. Model # ................................................................................ 3. Model # .................................................................................
Serial number ......................................................................
Serial number ......................................................................
4. Model # ................................................................................ 4. Model # .................................................................................
Serial number ......................................................................
Serial number ......................................................................
Air handling equipment
Manufacturer .....................................................................................................................................................................................
Model # ...................................................................................... Serial number : ...........................................................................
Additional air handling units and accessories ....................................................................................................................................
Preliminary equipment check
Is there any shipping damage? ................................................. If so, where? ...............................................................................
............................................................................................................................................................................................................
Will this damage prevent unit start-up? ..............................................................................................................................................
Unit is level in its installation
Power supply agrees with the unit nameplate
Power circuit wiring has been sized and installed properly
Unit ground wire has been connected
Electrical circuit protection has been sized and installed properly
All terminals are tight
All cables and thermistors have been inspected for crossed wires
All plug assemblies are tight
Check air handling systems
All air handlers are operating
All chilled water valves are open
All fluid piping is connected properly
All air has been vented from the system
Chilled water pump is operating with the correct rotation. Amperage: Nominal...............
Actual...................
EN-69
AQUACIAT
POWER
ILD