background image

 

"

Complementary list of parameters for advanced

configuration

P20

Stage differential (in heating)
Factory setting : 2K

P21

Differential between stages (in heating)
Factory setting : 3K

P22

Stage differential (in cooling)
Factory setting : 2K

P23

Compressor validation
Value 0 : operation not authorised
Value 1 : operation authorised

The parameter P23 permits operating the unit with  the auxiliary
devices only. It can help to ensure the heating while waiting for
repair on the refrigerant circuit (refrigerant leak, etc..).

If you have selected a regulation as a function of the outside
temperature (P02 and P03 = 1), the following parameters must
also be set :

H

 In heating (for P03 = 1)

P27 

External air temperature at the start of drift

P28 

External air temperature at the end of drift

P22 

Heating maximum water return setting 
at the end of drift

H

 In cooling (for P02 = 1)

P30 

outside air temperature at the start of drift

P31 

outside air temperature at the end of drift

P32 

Cooling minimum or maximum water return setting 
at the end of drift

If P07 = 1 (PCR), the parameters P02, P30, P31 and P32 are
not accessable.

P35

P29

P28

P27

P36

P32

P30

P31

Water return setting 

°

in heating mode

External air temperature 

°

C

Water return setting 

°

C

 in cooling

 mode

External air temperature 

°

C

"

Recommendations for parametering a PCR

installation (P07 = 1)

H

 In heating

Regulation as a function of the outside temperature : P03 = 1
Adjustment of the water law :
P36 = 20

°

C and P27 = 20

°

C

P28 = Min. basic outside temperature of the area
P29 = water return temperature used in the calculation of the
house thermal losses at the min. basic outside temperature
(example 35

°

C, max. 40

°

C)

H

 In cooling

P36 = 21

°

C inlands

P36 = 23

°

C at sea-side

"

Starting the unit

Once the parameters have been set, operate the emitters in
cooling or heating to have a thermal load, so that the thermody-
namic unit can operate.

You can then start the unit.  To do so, move the parameter P15
to value 1 by pressing simultaneously on 

+

 and 

RESET

.

Press key 

CONFIGURATION

 to exit the configuration mode.

The internal safety devices of the unit are engaged.  If a safety
device has tripped, the fault must be found, reset the safety
device and press the MRS5.1 

RESET

 key.

The thermodynamic unit start can only occur after a 2mn period
corresponding to the scrutinization period of all safety devices.

NOTE : To stop the unit, outside the cases of emergency, use :

– either the Climbox 2 programmer (passage to mode Stop),

– or a all or nothing external order which sends a stop order to
the thermodynamic assembly,

– or the remote control MCAD5 (passage to mode STOP).

Note : Be aware of a risk of frost if a cut in the electrical supply
occurs.

#   

H

 Check 

– that the discharge is heating (reading of parameter P55),

– that the absorbed amperage is normal (see table “ electrical
characteristics ”),

– the operation of all the safety devices (see the table “ regula-
tion and safety device ”).

Thermodynamic phenomena related to the installation, which
can arise when starting 

H

 Intake pressure too low

– Presence of air in the hydraulic circuit.

– Circulation too low, insufficient flow.

– Lack of heating load.

– Ventilation not correct, obstacle at intake or discharge, recycl-
ing.

H

 Condensing pressure too high

– Ventilation not correct (obstacle to intake or discharge).

– Air too hot at intake (recycling).

– Presence of air in the hot water circuit.

– Circulation too low, insufficient flow.

français

Deutsche

English

Summary of Contents for AQUACIAT ILZC 90Z

Page 1: ...ter Notice d utilisation User s brochure 09 2003 N 00 117 B r versible air eau Installation Fonctionnement Mise en service Maintenance thermodynamic generator Installation Operation Commissioning Main...

Page 2: ...otage du groupe avec les entr es Tout ou Rien du MRS 6 Pilotage du groupe avec la commande distance MCAD5 7 Appareils de r gulation et de s curit 7 Liste des d fauts 9 Report de d faut 9 Mise en route...

Page 3: ...d accident au moment des op rations d installation de mise en service et de r glage il est imp ratif de prendre en consid ration les sp cificit s du mat riel telles que circuit frigorifique sous press...

Page 4: ...ixation se r f rer au plan d encombrement livr avec l appareil Une tude de dimensionnement doit tre r alis e afin de res pecter les conditions de fonctionnement d bit pertes de charge Le diam tre des...

Page 5: ...appareil Les liaisons lectriques sont r aliser comme suit Raccordement du circuit de puissance Raccordement du conducteur de protection sur la borne terre Raccordement ventuel des contacts secs de d...

Page 6: ...dessus de P09 Le groupe r gule avec la consigne fixe sur le retour d eau P36 La molette du bo tier d ambiance et la temp rature ext rieure n ont aucune influence dans ce mode Nota ce mode de rafra ch...

Page 7: ...ompresseur la led verte de mar che compresseur clignotera Les leds jaunes permettent de visualiser l action demand e marche arr t acc s aux param tres relance PAC mode hors gel Les leds rouges signale...

Page 8: ...mont sur la tuyau terie entre l entr e et la sortie d eau de l changeur et en contr le la bonne circulation d eau Si celle ci est insuffisante il s ensuit une coupure de l alimenta tion du compresseu...

Page 9: ...d faut de type neutre sur la borne 5 du bornier J5 en cas de d faut niveau 1 ou 2 cette borne se comporte comme un neutre Exemple d utilisation visualisation des d fauts par allumage d une lampe Char...

Page 10: ...res renseign s faire fonctionner les met teurs en froid ou chaud pour avoir une charge thermique et que le groupe thermodynamique puisse fonctionner Vous pouvez alors d marrer le groupe Pour ce faire...

Page 11: ...l installation Charge de r frig rant Poids kg Poids kg 0 1 0 1 Compresseurs Tension 6 7 8 6 7 8 Compresseurs Intensit maxi de fonctionnement A Ventilateurs Moteur ventilateur A Nombre d tages 1 1 R s...

Page 12: ...ffage la carte affiche INIT D La tension chute trop au d marrage V rifier les composants lectri ques de l installation section du c ble d alimentation disjoncteur 2 Essai en froid Date Heure Pression...

Page 13: ...Control of unit with MRS all or nothing entries 17 Control of unit with MCAD5 remote control 18 Safety and regulation devices 18 List of faults 20 Fault transfer 20 Commissioning 20 Verifications bef...

Page 14: ...order to avoid all risks of accident during the installation com missioning and adjustment operations it is imperative to take into consideration the specificities of material such as refrigerant cir...

Page 15: ...it to get the dimen sions of the mounts and the fixation details A study of the dimensions must be carried out in order to respect the operating conditions flow pressure drops The tube diameter is not...

Page 16: ...electrical diagram of the unit The electrical liaisons are to be carried out as follows Connection of the power circuit Connection of the protection conductor on the earth terminal Possible connection...

Page 17: ...urn The ambient box tumbwheel and the outside temperature have no influence on this mode Note the cooling mode permits creating a temperature diffe rence of 3 to 5 C between the indoor and outdoor tem...

Page 18: ...s signal a level 1 or 2 operating fault In case of level 1 fault the key 8 relaunch permits relaunching the elec trical auxiliary devices for a 48 hours heating period while wait ing for repair The di...

Page 19: ...motor against overheating A sensor positioned at the compressor outlet also controls the discharge temperature B7 In case of fault the compressor stops and it is displayed on the MRS5 1 card dis play...

Page 20: ...e absence of refrigerant fluid leak Make sure that water circulates in the generator when the circulator is operating Purge the air of the hydraulic circuit Check the tightening of all the electrical...

Page 21: ...asic outside temperature example 35 C max 40 C H In cooling P36 21 C inlands P36 23 C at sea side Starting the unit Once the parameters have been set operate the emitters in cooling or heating to have...

Page 22: ...y of the installation Operating charge Weight kg Weight kg Compressor Voltage Compressor Nominal current A Fans Fan motor speed A Stage number Electrical Output kW Electrical heating elements Voltage...

Page 23: ...if there is no dialogue When starting one of the heating components the card displays INIT D The voltage drops too much when starting Check the installation elec trical components supply cable sectio...

Page 24: ...SEITE 25 25 25 25 25 25 26 26 26 26 27 27 27 27 01 2 27 28 3 4 29 29 3 31 3 54 31 4 4 31 54 6 4 4 31 7 31 6 31 8 31 3 4 32 32 54 32 33 9 33 34 4 8 8 34 34 fran ais Deutsche English...

Page 25: ...D 4 4 E 4 F 6 G 4 4 8 6 F 4 4 4 4 4 F 9 9 G 7 3 4 6 4 F 4 6 4 4 G 4 4 4 6 4 F F 4 F 9 4 4 3 4 F 4 6 4 9 F 4 6 F 4 G 4 4 F 6 6 4 4 9 4 4 4 4 H 4 54 4 4 I 4 4 4 4 6 Terrassen Installation Garten Instal...

Page 26: ...6 6 4 6 4 Baugr sse 22 30 130 Wasseranschluss Durch messer Gas Au engewinde 1 1 9 Baugr sse 22 30 50 130 Schlauchdurchmesser 1 1 1 Dicke der Isolierung 9mm 9mm 13mm 6 4 A 6 4 4 0 0 3 4 JD 0 3 4 JD A...

Page 27: ...ABB 06 10 D B P P G B 4 DB Das Kabel richtig w hlen unter Beachtung L G L 7 L 6 L G L 4 4 L L L 6 4 G F 4 4F 9 4 4 4 4 Q 8 4 G G G8 0 3 L 9 L L 3 L 6 4 4 9 9 L 54 3 L 4 8 L 9 4 4 L 3 3 4 BF 2 L 3 4 L...

Page 28: ...Thermostats f r 63 C Lage des Thermostats f r 78 C CN 22 CN DB 4 DB 9 0 8 CN 22 CN DB 4 DB JD 9 4 9 1 0 8 D 4 JD CN 4 A 9 2 9 9 6 4 F 4 6 9 9 6 9 9 012 3 4 9 E2 9 CF NF MF BF F 2 9 7 3 6 G 9 C 4 2 9 E...

Page 29: ...F 8 F F 3 4 4 4 4 2 3 4 4 N AN 4 54 4 9 8 6 AN 4 H 8 D F DJF 4 S 4 4 K J 6 P F 6 H AN 2 6 3 4 2 4 F 3 F 4 4 4 3 7 8 F 4 F H 8 6 8 L 3 4 B G 4 6 L 3 4 4 4 AN 54 4 9 L 3 4 2 4 9 F 4 F Q F K0 K F 6 3 9 F...

Page 30: ...ck 50 105 H 8 9 F CN 4 I 4 4 H 9 4 F 4 6 54 4 3 4 4 4 C 4 9 3 B F 3 4 2A 3 J 9 4 4F J 2 4 4 4 B H 6 3 4 3 4 3 3 9 4 4 6 3 2 F J 4 9 3 A B 4 J 4 N F 3 4 2 A 2 4 F 4 N H 5 8 54 4 6 3 F 012F 4 9 6 8 5 4...

Page 31: ...3 4 2 M C 2 3 4 2 M N M M B 2 4 2 B 4 012 4 B 2 B 4 4 B H 6 8 9 4 3 54 9 9 E 3 4 2 6 9 G 4 3 9 B 8 5 8 8 L F 9 6 9 L F 4 L L 9 L F G 4 4 4 4 PJO L B O 4 G F 9 4 54 F 4 F 16 2 9 6 4 3 T B 4 N 6 B 4 4 5...

Page 32: ...Au enlufttemperatur C 6 78 CB H 8 8 4 BDR D R2B_ 2CR2B_ 2NR 2MR F 6 9 6 D _ F AB_ H 4 8 8 DJR2 _ DJR2D_ 9 G 4 F 9 9 4 4 F 4 4 E 16 2 F G 0 0G3 6 3 G 9 8 6 2 8 4 G G F 6 L 01 2 4 F L F F L 3 4 4 G 3 3...

Page 33: ...DA B AB DAB A kg 2BB 22 A AD JN C DMB AJ 7 00 12 32 43 52 612 52 612 9 2DB B ABB D B 9 4 A D J N C B D D C M 2 J C M 2 J 9 A B J B J D D D D D D D D D D kW D D D A D CP2 C D D C D 2 C JP D V 2DB B AB...

Page 34: ...Die Steuerung mit der ClimBOX 2 funktioniert nicht D berpr fen dass der Parameter P 04 mit 0 und P 15 mit 1 besetzt ist D berpr fen dass die Phase des AQUACIAT gut mit der Phase der ClimBOX 2 verbund...

Page 35: ...D partement R frig ration Export Department D partement SAV Si ge social Usines T l 04 79 42 42 42 Fax 04 79 42 42 10 Internet http www ciat com...

Reviews: