11
Step 4(
FIG .4)
1) Attach the Leg Developer (5) to the Seat Support Tube (4) with Hexagon Head Bolt
M10x65 (61), M10 Nylon Nut (71), and
φ
11 Washers (68-2pcs).
2) Insert Roll Pad Tube (20-2pcs) halfway through the holes on the Seat Support Tube
(4) and Leg Developer (5). Push Heel Holders (35-4pcs) onto the Roll Pad.
3) Attach the Seat Pad (38) onto the Seat Support Tube (4) with Hexagon Head Bolts
M8x55 (64-2pcs) and
φ
9Washers (69-2pcs).
4) Attach the Backrest (37) to the Main Support Tube (3) with Hexagon Head Bolts
M8x65 (64-2pcs) and
φ
9Washers (69-2pcs).
Step 5(
FIG 5)
1)Attach the Hooks use Punching bags (53) to the Punching bags Support Tube(16)
with M10 Nylon Nuts (71),Attach the Punching bags (39) to the C-Clip (52) to the
Hooks use Punching bags (53),than take the Stretch cord(51)to the C-Clip (52) to Base
Tube for Punching bags .
2) Attach the Seed ball Round plate (40) to the Seed ball Support Tube(17) with Hooks
use Seed ball(54) ,and one Handgrip
∮25(42),
and M10 Nylon Nuts (71),Attach the
Seed ball (39) Seed ballg (41)to the Hooks use Seed ball(54)
6 1
5 9
5 9
5 9
5 9
7 1
7 1
5 9
5 9
5 9
5 9
FIG. 4
FIG. 5
Summary of Contents for CD-2006A
Page 4: ...3 OVERVIEW DRAWING...