After proper wiring and piping of boiler system is complete, testing of
controls can start. 

Before testing controls, it is recommended that

all contactor fusing be removed.

This is to prevent possible element

failure under test conditions.

A. OPERATING AND TESTING THE McDONNELL &

MILLER LOW WATER CUTOFF CONTROL.
1.

Be sure all valves from incoming water supply are fully open.

Turn boiler switch to “ON” position,

pump or solenoid

valve will energize, allowing boiler to fill with water. Proper
water level is automatically reached with level control sup-
plied. Pump or solenoid feed will shut off at proper water level.
Contactor(s) will energize, supplying power voltage to ele-
ments.

2. Checking operation of pump switch.

(Figure 1) With water

level visible in sight glass, partially open drain valve at bottom
of boiler. If automatic blowdown supplied, push manual blow-
down switch until valve open light is on, hold for few seconds.
Water level will fall, allowing float to trip pump switch to
“ON” position. Close drain valve or release manual blowdown
switch.
Pump motor or solenoid valve will energize and water level
will resume to normal level in sight glass.

3. Checking low water cutout switch operation,

open drain

valve completely. If automatic blowdown supplied, push in
and hold manual blowdown switch until water level falls
enough to trip cutout switch. Close drain valve or release man-
ual blowdown switch. If low water cutout is automatic reset,
pump or solenoid will return water level to normal. If low
water cutout is manual reset, then manual reset button on
McDonnell & Miller low water cutoff control must be pushed
to complete circuit. 

Turn off boiler. Reinstall contactor

fuses.

WARNING:

Be sure all electrical connections are tight

before energizing boiler. Reset all manual reset con-
trols by pushing reset buttons on: (1) high limit control
located on top of boiler and (2) McDonnell & Miller
located on the side of boiler.

Diagram 14

TYPICAL WIRING DIAGRAMS

3

GND

C1

CR

C2

C3

2PS

1PS

On

Off

FU16

IFS

O

O

Y

BR

B

B

1PB

1

2

W

R

Boiler

On

9.9

Heater Contactor

1LT

2 HTR

1 HTR

1L1

1L3

1L2

2L1

2L3

2L2

C1

C2

FU1

FU9

FU8

FU7

FU6

FU5

FU4

FU3

FU2

C3

3 HTR

3L1

3L3

3L2

L1

L3

L2

1

GND

2

GND

Heater Contactor

FU12

FU11

FU10

C4

4 HTR

4L1

4L3

4L2

Heater Contactor

Heater Contactor

346V 3Ø 50 HZ

220 VAC Single Phase Control Circuit

1

C4

1CR-1

BW

1CR-2

Customer Pump

Connection

FU

1  2  3

FU

4  5  6

FU

7  8  9

C1

C4

C2

3

HTR

2

HTR

1

HTR

4

HTR

1

2

2TB 1TB

GND

2

GND

  1

GND

FU16

1PB

Cabinet Exterior Left Side

Cabinet Exterior Right Side

Panel Layout

Feed Water

Electrical

Connection

FU

10

11  12

C3

1CR

FU13

FU14

FU15

5L1

5L3

5L2

1

Mtr

Customer

Connect

Feed Water

Motor

10L

30L

20L

IT1

IT3

IT2

CR

Wire Color Code

B

= Black

BR = Brown
R

= Red

O

= Orange

Y

= Yellow

G

= Green

BL = Blue
W = White

11

A

C

D

B

Line

Pump

Low-Water

Cut-Off

Terminals

Alarm

Circuit

Terminals

Pump

Circuit

Terminals

Pump

Switch

Cut-off

and

Alarm

Switch

Adjusting

Screws

Figure 1

— Automatic Reset Low-Water Cutoff Junction Box

PRE-OPERATION CHECK

Summary of Contents for CHPES-100A

Page 1: ...50 6 17 CHPES 135A 13 9 136 30 5 410 8 50 4 50 8 17 1 30 CHPES 160A 16 1 157 5 30 5 475 7 60 3 60 7 22 5 CHPES 180A 18 4 180 30 5 543 8 60 4 60 8 22 5 Chromalox DIVISION 4 SECTION CHPES SALES REFEREN...

Page 2: ...lt Hole Typical Steam Outlet Sight Glass Element Element Access Door Operating Pressure Controls Control Circuit Fuse Control Circuit On Off Switch with Pilot Light 5 8 7 16 Bolt Hole Typical 1 1 4 Dr...

Page 3: ...A minimum distance of 18 between boil er and any combustible material must be maintained 3 Complete all piping to boiler Connect water line to tagged fitting on the motor and pump assembly if used or...

Page 4: ...rical connections are sufficiently tightened 6 WARNING Substitution of components or modifica tion of wiring system voids the warranty and may lead to dangerous operating conditions 7 SPECIAL INSTRUCT...

Page 5: ...tor 10L 30L 20L IT1 IT3 IT2 CR Wire Color Code B Black BR Brown R Red O Orange Y Yellow G Green BL Blue W White Diagram 3 2PS BR Heater Contactor Feed Water Boiler On 3 GND B FU9 B 1PB Off 1 GND 1 HTR...

Page 6: ...tomer Connect Feed Water Motor 10L 30L 20L IT1 IT3 IT2 CR Wire Color Code B Black BR Brown R Red O Orange Y Yellow G Green BL Blue W White Diagram 5 2PS BR Heater Contactors Feed Water Boiler On 3 GND...

Page 7: ...Customer Connect Feed Water Motor 10L 30L 20L IT1 IT3 IT2 CR Wire Color Code B Black BR Brown R Red O Orange Y Yellow G Green BL Blue W White Diagram 7 2PS BR Heater Contactors Feed Water Boiler On 3...

Page 8: ...ion CR FU19 FU20 FU21 7L1 7L3 7L2 1 Mtr Customer Connect Feed Water Motor 10L 30L 20L IT1 IT3 IT2 CR C1 Wire Color Code B Black BR Brown R Red O Orange Y Yellow G Green BL Blue W White Diagram 9 FU 1...

Page 9: ...5 FU26 FU27 9L1 9L3 9L2 1 Mtr Customer Connect Feed Water Motor 10L 30L 20L IT1 IT3 IT2 CR Wire Color Code B Black BR Brown R Red O Orange Y Yellow G Green BL Blue W White Diagram 11 FU 1 2 3 FU 4 5 6...

Page 10: ...r Contactor CR FU22 FU23 FU24 8L1 8L3 8L2 1 Mtr Customer Connect Feed Water Motor 10L 30L 20L IT1 IT3 IT2 CR Wire Color Code B Black BR Brown R Red O Orange Y Yellow G Green BL Blue W White Diagram 13...

Page 11: ...switch If low water cutout is automatic reset pump or solenoid will return water level to normal If low water cutout is manual reset then manual reset button on McDonnell Miller low water cutoff cont...

Page 12: ...de of boiler Customer Supplied 2 Turn on boiler and allow pressure to build up to operating pressure 3 Only open globe valve at quarter turns at first introducing smaller amounts of steam into process...

Page 13: ...CLOSED and the BOILER ON should light up again Now turn the wheel on the large timer until the OFF tab passes the TIME NOW arrow The BOILER ON light should go out and the valve should begin to open O...

Page 14: ...s its open position until circuit balance is achieved The slightest change in the pressure of the controlled medium will cause a change in the number of elements energized to compensate for it thus ke...

Page 15: ...OF SEQUENCER 1 With boiler off remove wiring from pressure control on sequencer low voltage terminal board 2 Turn on boiler to supply the voltage to the sequencer Short ter minal R and B for countercl...

Page 16: ...n accordance with local and national electrical codes Refer to boil er instruction for manual wiring diagram 5 If pump is located less than 30 feet from boiler a second check valve is required WATER F...

Page 17: ...ensure the boiler has ade quate water 3 A monthly inspection should be made of internal wiring All elec trical connections should be checked for tightness A check for water or steam leaks should also...

Page 18: ...y Slic Tite Gasket Compound or equal to both surfaces of new gasket with supplied replacement element Proceed to install element flange assembly with gasket between boiler flange and element flange In...

Page 19: ...039 004 5 Step Motor Driven Sequencer 323 121505 001 10 Step Motor Driven Sequencer 323 121505 002 6 Step Solid State Sequencer 323 300107 015 10 Step Solid State Sequencer 323 300107 015 Siphon Tube...

Page 20: ...BLVD OGDEN UT 84404 Phone 1 800 368 2493 www chromalox com Limited Warranty Please refer to the Chromalox limited warranty applicable to this product at http www chromalox com customer service policie...

Reviews: