13
GB
ASSEMBLY INSTRUCTIONS
Remove all the separate parts from the packaging,
lay them on the floo and check roughly that all are
there on the base of the assembly steps. Please note
that a number of parts are connected directly to the
main frame preassembled. In addition, there are sev
-
eral other individual parts that have been attached to
separate units. This will makes assembly easier and
quicker for you.
Assembly time: 30 - 40 min.
1.
Attach the front stabilizer (69) assembled with
front caps with transportation roller (70) to main
frame (49) by using bolts M8x45 (73), washers (30),
spring washers (29) and cap nuts (48).
2.
Attach the rear stabilizer (72) assembled with
height adjustable caps (71) to main frame (49) by us
-
ing bolts (73), washers (30), spring washers (29) and
cap nuts (48). (For uneven floor, you can adjust the
height at rear caps (71) and secure for stable posi
-
tion)
1.
Attach the pedal straps to the pedals (59L+59R).
(The pedal strap and pedals are marked with “L” for
left and “R” for right.)
2.
The pedals (59L+59R) are marked with „R“ for
right and „L“ for left. Right and Left are specified as
viewed seated on the machine during training.Con
-
nect each pedal (59L+59R) to the matching pedal
crank (60L+60R). (
NOTE:
The right pedal „R“ should
be threaded on clockwise. The leftpedal „L“ should
be threaded on counter-clockwise.)
Attach the stabilizer (69+72).
Attach the pedals (59L+59R).
STEP 1:
STEP 2:
1.
Push the rubber ring (74) and the support cover
(75) onto handlebarsupport (21).
2.
Hold the handlebar support (21) with the com
-
puter cable (22) against themain frame holder. Con
-
nect the plug for the computer cable (22) coming out
of the bottom of the handlebar support (21) of the
computer with the matching plug for the sensor ca-
ble (19) coming out of the main frame (49). (
Note:
The computer cable harness (22) projecting from the
support (21) must not slide into the tube, as it is re
-
quired for later steps of installation.)
3.
Connect the resistance control (17) to the brack
-
et of lower section cable tension (23) (See figure [1]-
[3]). Before this step of the installation, it is advisable
to adjust the resistance setting to the highest stage,
at which the cable extends furthest from the sheath.
Put the lowest part of cable (17) into the small hook
(figure 1). Pull it (figure 2) until the small hook get in
higher position and then insert the cable (17) onto
the bracket (23) (figure 3).
4.
Place the handlebar support (21) in the loca
-
tor provided for it in the main frame (49). Ensure
that the cable connections made in step 3 are not
squashed. When putting the steering tube in place,
push the former slowly down into the locator in the
main frame. Screw the handlebar support (21) onto
the base frame (49) with the screws (24), spring
washers (29) and washers (25).
5.
Push the handlebar support cover (75) with rub
-
ber ring (74) into right position to cover up the screw
connection point.
Attach the handlebar support (21) at main frame (49).
STEP 3:
Summary of Contents for 2006
Page 52: ...52 NOTIZEN NOTES REMARQUES OPMERKINGEN ЗАМЕТКИ ...
Page 53: ...53 ...
Page 54: ...54 ...
Page 55: ...55 ...