04
Installation
3
3.1
Installation
14
.8
±
0.
35
5
±
0.
12
7
2
.5
±
0
.4
3
7
8
±
0
.4
3
35.7
O
F
F
1/
L
1
3
/L
2
5
/L
3
2
/L
1
4
/L
2
6
/L
3
6
3
.5
±
0
.3
7
112.5
±
0.57
IEC
60947-2
60947-4-1
2004/08/04-010
Te
st
NS2-80B
56-80A
68
56
80
Figure 2 Overall and installation dimensions of NS2-80B
See Figure 3 for assembly procedure of starter and auxiliary contacts
when the starter is disconnected:
a) Confirm the starter is disconnected (the red OFF button is press
down);
b) Hang the front end of the auxiliary contacts on the slot at the left
front of the starter and move the auxiliary contacts towards the starter;