6
Instruction Manual
SLB-9000
Group C Installation Procedures:
1. Turn your projector over and place it on a clean, flat, suitable
surface.
2. Find and open the hardware kit (parts) for your projector model
(see “SELECT PROJECTOR MODEL AND DETERMINE
PARTS” on page 3).
3. Place a 3/8” X 1/2” Nylon spacer over each threaded insert in
the bottom of your projector.
4. Using Figure 3, find the proper mounting holes in SLB-9000
for your projector.
5. Place the SLB-9000 on the 3 Nylon spacers, aligning the
proper mounting holes in SLB-9000 with the Nylon spacers.
CAUTION
: When attaching the mount, be careful not to over-
tighten mounting screws.
6. Secure the SLB-9000 to your projector using three M4-20mm
pan-head screws, three M4 flat washers, and three 3/8” X 1/2”
Nylon spacers provided.
7. See RPA and/or Smart-Lift Instructions.
Group D Installation Procedures:
1. Turn your projector over and place it on a clean, flat, suitable
surface.
2. Find and open the hardware kit (parts) for your projector model
(see “SELECT PROJECTOR MODEL AND DETERMINE
PARTS” on page 3).
3. Place a 3/8” X 1/2” Nylon spacer over each threaded insert in
the bottom of your projector.
4. Using Figure 4, find the proper mounting holes in SLB-9000
for your projector.
5. Place the SLB-9000 on the 3 Nylon spacers, aligning the
proper mounting holes in SLB-9000 with the Nylon spacers.
CAUTION
: When attaching the mount, be careful not to over-
tighten mounting screws.
6. Secure the SLB-9000 to your projector using two M4-20mm
pan-head screws, one 20mm flat head screw, and two M4 flat
washers.
7. See RPA and/or Smart-Lift Instructions.
Figure 3. Group C Hole Alignment
Figure 4. Group D Hole Alignment