Installation Instructions
PWS
3
INSPECT THE UNIT BEFORE INSTALLING
WARNING: Watch for pinch points. Do not put your fingers
between movable parts.
1. Carefully inspect the PWS for shipping damage. If any damage
is apparent, call your carrier claims agent and do not continue
with the installation until the carrier has reviewed the damage.
NOTE:
Read all instructions before starting installation.
2. Lay out components to ensure you have all the required parts
before proceeding:
1 PWS (see PWS dimensional drawing on page 2)
1 PDB Package (see PDB Instruction Sheet for
contents of this package)
PWS INSTALLATION
WARNING: It is the responsibility of the installer to verify that
the wall to which the PWS is anchored will safely
support the combined load of all attached compo-
nents and equipment.
CAUTION:
DO NOT attempt to mount the Plasma Display Panel
(PDP) in an inverted position. Mounting the PDP in
an inverted position may cause overheating and
extensive damage to the PDP.
Install the PWS as follows:
1. Determine the exact mounting location prior to installation,
considering the unit’s total swing arm radius.
2. Using the wall plate as a pattern, transfer the mounting hole
pattern to the wall.
NOTE:
Notice the wall plate has a nominal hole (2”X4”) to
accommodate a duplex wall outlet.
3. Drill pilot holes at the desired height.
WARNING: Improper installation can result in serious per-
sonal injury! Make sure that the structural mem-
bers can support a redundant weight factor
five
times
the total weight of the equipment: if not,
reinforce the structure before installing the PWS.
4. With the PWS correctly oriented and level, secure the PWS to
the wall using a minimum of four fasteners (not included). Fas-
teners must be driven into the supporting wall studs or other
supporting framework.