MSP-WLB/D SERIES
Installation Instructions
16
Cable Management
WL2B
Option A
1.
Connect cables to display.
2.
Route cables through cable management clips on array rail
and down towards swing arm. (See Figure 35)
Figure 35
3.
Route cables underneath swing arms.
4.
Secure cable management covers (X) to swing arms using
two #8-32 x 3/8” Phillips flat head screws (AA) per cover.
(See Figure 36)
Figure 36
Option B
1.
Connect cables to display.
2.
Route cables through cable management clips on array rail
and down towards swing arm. (See Figure 35)
3.
Place two cable management covers (X) upward into swing
arms and secure to swing arms using wire ties (Z) and two
#8-32 x 3/8” Phillips flat head screws (AA) per cover. (See
Figure 37)
4.
Slide cable ties (W) between wire ties (Z) and cable covers
(X) and route cable under arms. (See Figure 37)
5.
Secure cables to arms by closing cable ties (W). (See
Figure 37)
Figure 37
WL6B
1.
Route cables from display through cable management
covers (H) as desired. (See Figure 38)
2.
Install cable management covers (H) onto column (A). (See
Figure 38)
Figure 38
cable management clips
2
(C) x 2
(H) x 4
3
3
4
(X) x 2
(AA) x 4
3
3
4
(Z) x 4
(AA) x 4
3
3
4
(W) x 4
4
(X) x 2
1
1
2
2