02/04/2013
PM 2946 7002 09
Page 9 of 39
6 Main screen
When the voltage is switched on, the first screen is a test screen. The next screen is the Main screen, shown automatically.
The Main screen shows:
•
The compressor status by means of pictographs
•
The air outlet pressure
Always consult your supplier if the pressure on the display is preceded by a "t".
1