Page 8
For technical questions, please call 1-888-866-5797.
Item 61441
SAFET
y
O
PERA
TION
M
AINTENAN
c
E
SETUP
Specifications
Electrical Rating
120VAC / 60Hz / 15A
Blows Per Minute
1030 BPM
Included Chisels
1 Bull Point, 1 Flat
228456
Setup - Before Use:
Read the ENTIRE IMPORTANT SAFETy INFORMATION section at the beginning of this
manual including all text under subheadings therein before set up or use of this product.
TO PREVENT SERIOUS INJURy FROM AccIDENTAL OPERATION: Make sure that the Trigger is in the off-
position and unplug the tool from its electrical outlet before performing any procedure in this section.
Note:
For additional information regarding the parts listed in the
following pages, refer to
Parts List and Diagram
on page 18.
Assembly
The only assembly required for the Breaker Hammer
is the installing of the Left Handle (82) to the side
of the Gear Box (86) and the Spline Axle (91).
1. First, slide Left Handle over the Spline Axle so
that the end of the Spline Axle slides through
the opening in the Left Handle. See Figure A.
Gear
Box (86)
Spline
Axle (91)
Secondary
Handle (82)
Figure A
2. With your other hand, hold and slightly twist
Right Handle (51) while slowly manipulating Left
Handle over the Spline Axle until the splines line
up and it fits snug into place. See Figure B.
Secondary
Handle (82)
Main
Handle (51)
Figure B
3. Thread Nut (40) over tip of Spline Axle.
Use Wrench (not included) to fasten Nut,
securing Left Handle in place. Periodically,
check Nut for tightness. See Figure C.
Nut (40)
Secondary
Handle (82)
Spline Axle (91)
Figure c
Summary of Contents for 61441
Page 1: ......