
TABLE OF CONTENTS
SAFETY (READ FIRST) ................................................................................................................................ 1
INTRODUCTION ........................................................................................................................................... 3
A. Important Vehicle Owner Advisories ................................................................................................ 3
B. SEQUENT P&D Installation Kit Contents ........................................................................................ 3
C. Required Tools & Equipment ........................................................................................................... 5
D. Torque
Specifications
...................................................................................................................... 5
E. Installation Note (corrosion protection) ............................................................................................ 5
INSPECT FOR CORRECT VEHICLE INFORMATION & THE OPERATIONAL INTEGRITY OF THE
ENGINE ......................................................................................................................................................... 6
A. Preliminary
Inspection
..................................................................................................................... 6
B. Scan Tool Inspection ....................................................................................................................... 6
C. High Mileage Vehicle Inspection (75k+) .......................................................................................... 7
SEQUENT P&D INSTALLATION .................................................................................................................. 8
A. Pre-Installation Bench Assembly ..................................................................................................... 8
B. Intake Manifold, Ignition Coil Pack and Air Filter Housing Removal .............................................. 11
C. Intake Manifold Modifications ........................................................................................................ 11
D. Zenith Regulator and Coolant Hose Installation ............................................................................ 13
E. Lockoff and High Pressure Tubing Installation .............................................................................. 14
F. Fuel Rail Installation ...................................................................................................................... 15
G. CNG Low Pressure Hose Connections ......................................................................................... 16
H. Sequent / OEM ECM Electrical Connections ................................................................................. 17
•
Proper Wire Splicing ............................................................................................................... 17
I.
Sequent ECM, Relay & Fuse Locations ........................................................................................ 20
J. Battery
Connections
...................................................................................................................... 20
K. Re-install the Ignition Coil Pack and Upper Intake Manifold .......................................................... 21
L. Sequent MAP Sensor Installation .................................................................................................. 21
M. OBD-II Connections and Changeover Switch / Buzzer Installation ............................................... 22
N. Sequent Component Electrical Connections ................................................................................. 23
O. Final
Connections
.......................................................................................................................... 23
P. Fuel Level Calibration .................................................................................................................... 23
Q. Initial Engine Start .......................................................................................................................... 24
R. Sequent “Delta-P” Pressure Adjustment ........................................................................................ 24
S. Warranty Card, Labels and Owner’s Guide ................................................................................... 25
T. Maintenance
.................................................................................................................................. 27
Summary of Contents for IMPALA 3.9L 2009
Page 1: ...Rev B...
Page 30: ......