
3 of 11
K
K
e
e
y
y
p
p
a
a
d
d
:
:
0-9
= Data Entry
E
= Enter or Exit
B
= Up / Increase
F
= Down / Decrease
C
= Left / Forward
D
= Right / Back
J
J
o
o
b
b
b
b
i
i
n
n
g
g
:
:
Basically, there are 4 steps:
1. Set-up Home Position (Home stop)
2. Set-up Away Position (Away stop)
3. Set-up the number of Jobs to be executed (number of Job magnets)
4. Give the Boom the Crop watering instructions
JOB 3
JOB 1
JOB 1
JOB 2
JOB 3
JOB 2
JOB #02 Magnet
JOB #03 Magnet
Double Rail Boom
tracks (rails)
AWAY Position Magnet
(End of JOB 03)
HOME Position Magnet
(Start of JOB 01)