Cheonsei KEMPION PDS Series Instruction Manual Download Page 12

12

 

 

Caution

 

Do not use the controller (BLDC M/C UNIT) below 10%.

 

 

Warning

 

  Do not operate when suction valve and discharge valve are closed or do not close suction 

valve and discharge valve during operation. Pump and piping may be damaged with excessive 

pressure rising and liquid may spout when operation under valve closing.

  

10-1 Preparation                                      

 

 When operating pump for the first time after installation, please check the following conditions.

 Check if there is oil leakage caused by any damaged parts or loosened bolt.

 

Check the oil gauge to see if the driving part of pump is filled with the oil of regulated amount. 

     (The normal position of the oil level is the middle red point of the gauge.)

  Check if all of accessories, liquid to be transferred, and power supply necessary for pump operation are ready.

10-2 Operation

 Open the suction and discharge valves. 

 Check the rated power and turn on the pump. Check if the motor fan rotates clockwise. 

  (This is only for inverter or general motor) 

  Open the discharge side up to the atmospheric pressure, and increase the discharge amount slowly 

up to 50%. Connect to the flange of the discharge side, and then operate test run for 30minutes. 

   Caution) When the ambient temperature is low, overload may occur temporarily due to low 

temperature of lubricant. Wait until the lubricant temperature increases with no load. 

  If there is no error found during test run, set the discharge capacity to 100% and increase the 

pressure of the discharge side up to the setting one. Check if the BLDC controller works properly 

and if every part works properly.

 

10-3 Control of discharge amount

 The discharge amount can be controlled by the controller (BLDC M/C UNIT). 

 

 The controller can operate within 10 ~ 100%, but its effective flow rate-controllable range is 

20 ~ 100%. (Within 20 ~ 100%, the discharge amount is stable) 

10-4 Restart of pump

  In case of stop pump operation for short period(less than 1 week), run the pump at a desired stroke 

length & prescribed discharge pressure after air bleed operation. 

  In case of stop pump operation for a long period(more than 1 week), the pump should be run at 

atmospheric pressure of discharge side for several minutes before going into normal operation. 

  Do not start regular operation before above warming up.(Set the controller to 50%) 

10

  Operation

 

 

Caution

 

   

Some water may be remained in the liquid end part of pump after final performance test. 

    In case of use for some liquids reacting radically to water, remove water in the pump and dry  

the pump necessarily.

Summary of Contents for KEMPION PDS Series

Page 1: ...PDS Series Pulseless Diaphragm Pumps Instruction Manual www cheonsei co kr METERING PUMPS...

Page 2: ......

Page 3: ...struction manual at the place where you can see it easily 1 Notice for Safety 4 2 Confirmation of Product 5 3 General 5 4 Model Code 6 5 Standard Liquid End Material 6 6 Specification 7 7 Performance...

Page 4: ...or FC 0 80 if Liquid End material is SS Piping pressure Below the max discharge pressure indicated on the Specifications Pressure over the allowable one may cause damage to the product so install safe...

Page 5: ...op Provide adequate protection against freezing the pump and piping during winter season Make proper protection in consideration of indeliberate leakage from damage of pump Piping Dispose of waste pum...

Page 6: ...0 1 a b MODEL PDS PULSELESS DIAPHRAGM METERING PUMP DIS CAPACITY 5 5 5 L min 10 10 5 L min LIQUID END MATERIAL a Head P PVC F PVDF S STS316 X Special b Check Ball C CERAMIC S STS316 X Special CONNECTI...

Page 7: ...20mA Operating Over Current Err Relay Contact Output Effective Flow Control Range of Discharge Capacity Effective Flow Control Range of Discharge Capacity Others RATIO Setting range 0 100 based on re...

Page 8: ...nd Structure Gearbox flange Motor Joint Cover Attachment Gearbox Bed Head A B Cam Guide shaft Diaphragm rear Discharge Suction Head Check ball Diaphragm front Slider Diaphragm rod 40 1800 600 1200 0 2...

Page 9: ...tion discharge condition Piping should be short and less bending as far as possible and be careful not to make the cavity at which air stay Install piping support lest piping load fall on the pump Esp...

Page 10: ...tion piping in order to prevent air inflow into the piping Discharge rate of pump can be destabilized by air Inflow into the piping Make piping length of suction side as short as possible If it is too...

Page 11: ...ion of the diaphragm using the relay of the detector Do wiring to the terminal block of the detector in reference to the following instruction Input Power DC24V 300mA Relay Spec SPDT 2A DC30V Cable St...

Page 12: ...est run for 30minutes Caution When the ambient temperature is low overload may occur temporarily due to low temperature of lubricant Wait until the lubricant temperature increases with no load If ther...

Page 13: ...lume under actual running condition with measuring device such as mass cylinder If discharge volume had no fluctuation after repeated measurements the pump is judged to be running normally When the di...

Page 14: ...p from dust and or corrosion Check foreign substances lay on the Check Valve before restarting the pump 11 4 Other Maintenance When diluted liquid is used at freezing place in the winter install heat...

Page 15: ...check ball become dirty or damaged Clean or replace The piping or pump leaks at joints Inspect and repair The O ring of the valve gets damaged or defective Replace The constant velocity cam gets worn...

Page 16: ...ion side and discharge side joints Disassemble the joints in reference to 13 1 Unscrew the wrench bolts and separate the front cover Loosen the hexagon nut holding the guide bar using a spanner and di...

Page 17: ...s time rotate it counter clockwise to disassemble the diaphragm When the diaphragm displays any sign of abrasion or impairment replace it with a new one Assembly Assemble it in the reverse order of di...

Page 18: ...ty period Trouble of using by careless handling Trouble or damage due to using non designated part reconstructing the pump arbitrarily Trouble by fire or natural disaster Notes 1 The each quantity is...

Page 19: ...due to choking the valve with debris or closing the valve the safety valve will open automatically to relieve the pressure Relief valve prevents pump and piping from damages 18 1 Check Valve Model PDS...

Page 20: ...CSME I 01 2019 10 21 40 ANSANTECOM GIL SANGNOK GU ANSAN SI GYEONGGI DO KOREA Phone 82 31 508 1003 Fax 82 31 419 3223 E mail cheonsei cheonsei co kr Homepage http www cheonsei co kr...

Reviews: