47
For Europe 250Vac
Cord type min. H05RR-F or min. H03VV-F or min. H03VVH2-F, rated
min. 60C, 2x0.75mm2. Provided with molded-on un-grounding-type
attachment Plug, rated min. 250 Vac, min. 2.5 A. Opposite end
terminates in molded on, IEC320 style connector, rated min. 250
Vac, min. 2.5 A.
The Mains supply cord and plug of the external power supply
shall comply with any national regulations.
The user shall be made aware of that, if the NucleoCounter
and the external power supply is used in a manner not specified
by the manufacturer, the protection provided by the
NucleoCounter and the external power supply may be impaired.
Contact ChemoMetec A/S for information on order of a specific
Power supply cord listed above.
10.4 Dry compressed air
Dry, compressed air (KENAIR Air Duster - CFC Free) is used for
removal of dust from the optical system of the NucleoCounter
(refer to chaper 6).
The item can be obtained from Kenro Ltd, Greenbridge Road,
Swindon SN3 3LH, UK. Tel: +44 (0) 1793 615836, E-mail:
[email protected]. Alternatively the item, or a similar item,
might be available through local dealers.
10.5 External Printer (optional)
An external impact or thermo printer may optionally be
connected to the NucleoCounter for the printing of test
results.
Summary of Contents for NucleoCounter
Page 1: ...NucleoCounter User s Guide P N 991 0009 Revision 1 4 Technology that counts...
Page 2: ...i This page was intentionally left blank...
Page 4: ...iii This page was intentionally left blank...
Page 6: ...v This page was intentionally left blank...
Page 8: ...vii This page was intentionally left blank...
Page 10: ...ix This page was intentionally left blank...
Page 13: ...Introduction and intended use xii This page was intentionally left blank...
Page 21: ...1 Inspection and Unpacking of Equipment 4 This page was intentionally left blank...
Page 28: ...Fejl Henvisningskilde ikke fundet 11 This page was intentionally left blank...
Page 42: ...5 Operation of the NucleoCounter 25 This page was intentionally left blank...
Page 49: ...6 Total and viability count 32 This page was intentionally left blank...
Page 53: ...7 Maintenance of NucleoCounter 36 This page was intentionally left blank...
Page 58: ...8 Troubleshooting Error messages 41 This page was intentionally left blank...