
F10 Installation Manual
Rev. *60
23 of 71
Concrete Surface Installation
For mounting to concrete, use a 5/16” lead anchor and a #12 x 1 ½” panhead screw (CKP P/N
366291). Lead anchor (0.79cm) is a Power Fastener (P/N 09439). Screw is 0.55cm x 3.8cm.
Figure 3.10
Concrete Installation
Mounting the Power Supply
The power supply should be mounted near the electronics enclosure, or in a remote location, when
available space is limited. If the power supply is installed above a drop ceiling, the Conversion Kit
is required (see below). For the unit’s weight and dimensions, refer to
Appendix A: Power Supply
.
GS-599ES(R) Installation
Hold the unit in place and mark the screw hole locations. Secure the power supply in its location
in the same manner as before (refer to the
“Mounting the Electronics Enclosure”
section).
GS-599MC-KIT(R) Installation
Refer to
Appendix A: GS-599MC-KIT(R)
for the complete hood kit instructions.
1.
Drill a hole into the base material to the depth
required. The tolerances of the drill bit used
should meet the requirements of ANSI
Standard B212.15.
2.
Blow the hole clean of dust and other material.
Insert the anchor into the hole until the flange
is seated flush with the surface of the base
material.
3.
Position the fixture. Insert the screw tip
through the fixture into the anchor and tighten.