27
Final Installation Checklist
After you have completed installing your system use this checklist to make sure
everything is ready for your guests.
Physical Installation - CheckBox
CheckBox master unit is connected to power
CheckBox master unit is connected to internet connection
Network connection cable for CheckBox master is not stapled or cable
tied to AC wiring or power lines.
Physical Installation - Mesh Repeaters
Repeaters are connected to power
[Outdoor units only] Repeaters are mounted at least 20 feet off of the ground and
at least 4 feet away from other antennas.
Serial number of each repeater is noted for labeling by location in mesh display.
System Setup - CheckBox Master
Set administrative password
[For systems with Mesh Repeaters] Accept mesh repeaters into network on
Mesh page
Upload your graphic for Welcome Screen and Tickets
Set up your Welcome Message
Change SSID in Network Setup
Print out user tickets [for systems using tickets]
Set up Free Access [for systems using free access]
Set up PayPal credit card system [for systems using PayPal]