![Check Point 61000 Getting Started Manual Download Page 24](http://html.mh-extra.com/html/check-point/61000/61000_getting-started-manual_2594915024.webp)
Hardware Components
Check Point 61000 Security System Getting Started Guide R75.40VS for 61000 | 24
Link 2 ports
Yellow
blinking
Link is Active.
Off
Link is
disabled.
CTRL
SPEED
1
CTRL
SPEED
2
SSM1 and
SSM2
management
ports
Yellow
10 Gbps
Green
1 Gbps
Off
100 Mbps
Traffic 1
2
3
4
On
Data and Sync
traffic in SSM1,
SSM2, SS3,
SSM4.
L2
Off
Not used.
L1
Red. Lower
Right
Installation
started.
Red blinking,
in sequence
Installation in
progress.
Red. All
Installation
failure.
Yellow. Left
Installation
completed.