CHCNAV ALPHAUNI 900 USER MANUAL
| 2020-06
P a g e | 32
▪
Third, connect power cable with output port of controller box.
Top view
▪
Fourth, press self-locking switch of controller box to start 24V power supply. (12V port is
always powered)
Top view
▪
Can add more orange containers according to actual needs:
Two orange containers & One controller box (2+1, two sides)
Two orange containers & One controller box (2+1, one side)
Output port
Self-locking switch