20994124 REV A
22
4
Installation and Startup
This section will review the basic receiving, installation, and startup procedures for MVE
Fusion freezer. Always inspect the bill of lading for accuracy and external crate/packaging
for damage before accepting the shipment.
Included with each Fusion freezer:
Literature Packet
o
Fusion Quick Start Reference Guide – PN 13289481
o
Manual Freezer Status Log – PN10936355
o
Warranty Statement / Registration / Certificate
6 ft. transfer hose having “candy cane” pressure relief valve (inside freezer)
Liquid Nitrogen handling instructions
Desiccant bag (inside freezer) – To be removed and discarded before use
Silicon tube
A/C electrical power cord
MVE Checklist – Signed by shipping inspector
4.1 Filling the MVE Fusion
Following the careful uncrating and unpacking of the freezer, install using these basic
instructions.
CAUTION:
This information is included primarily for reference. Chart recommends any
cryogen filling/refilling be done by Chart personnel or a Chart-authorized distributor.
CAUTION
: Always wear protective gloves and face shield when work in with liquid
nitrogen. Refer to the Safety section (3) of this manual.
4.1.1 Procedure for First Fill of the MVE FUSION
Do not power on the Fusion until all steps are followed. Make sure to have two 230 liter
LN2 cylinders at 22-35 PSI for the first fill.
1. Load all racks and empty boxes or alternate inventory systems into the MVE
Fusion, except for those that would cover the access door in the bottom of the
lazy Susan. Refer to Figure 13 for a view inside a Fusion having storage racks
Summary of Contents for MVE Fusion
Page 1: ...20994124 REV A 1 MVE FUSION Technical Manual ...
Page 8: ...20994124 REV A 8 Figure 2 Cross Section of the MVE Fusion Freezer ...
Page 16: ...20994124 REV A 16 Figure 9 Left to Right Vent Overfill Valve Relief Valve and Fill Valve ...
Page 35: ...20994124 REV A 35 Figure 24 a Format of the Data logs screen b Format of the Data file ...
Page 50: ...20994124 REV A 50 NOTES ...