5

Product Manual - APPS 160

Installation

•  Remove the APPS 160 from the shipping crate  Visually 

inspect the unit to ensure there is no visible shipping 
damage 

•  Move the APPS unit to the exact installation location  

Location must be flat, level and made from a suitable 

material such as concrete  Normally the APPS unit is 
installed outdoors on the pad, near the bulk supply vessel 

 

Mark the locations of the four foot pad holes 

 

Move the APPS unit and drill holes for 3/8” cement 

anchors (not supplied) 

 

Install cement anchors 

 

Move the APPS unit back into position and bolt down 
securely 

•  Connect supply piping from bulk supply vessel to APPS 

160 inlet (1/2” male 45° flare fitting). Optional APPS fill 

hose PN 11000920 can be used for this connection 

•  Connect APPS outlet (1” MVE female bayonet) to 

vacuum insulated pipe system  Refer to the 

MVIP 

Product Manual PN 14736238

 located on www 

chartparts com for the proper procedure 

•  Connect 120 Volt / 60 Hz 200 watts (or 220 Volt / 50 Hz) 

electrical supply to APPS control box 

 

Conduit connector is located on bottom of control 
box 

 

Wiring should be connected to control box as follows:

 

Black (hot) wire to “H” connection on terminal 
block

 

White (neutral) wire to “N” connection on terminal 
block

 

Green (ground) wire to “GND BAR”

 

Ensure both valve switches are in “AUTO” position 

 

Replace control box cover and attach securely 

Start-Up

•  Ensure APPS 160 is completely and properly installed 

•  The APPS 160 unit should be purged with warm, dry 

nitrogen gas prior to introducing liquid to ensure that the 
unit does not have moisture in the inner vessel 

•  Turn APPS unit power switch to “ON” position 

• 

Open manual supply valve slightly to start flow of gas / 

liquid into APPS unit 

 

Throttle supply valve to prevent over-pressure of the 
APPS (opening the relief valves) due to vaporization / 

cool down losses during the initial fill.

 

Slowly open the supply valve as the APPS inner 
vessel is cooled to cryogenic temperature 

• 

After fill cycle ends, APPS will vent more often than 

normal for the first few hours.

• 

After the APPS is filled and stabilized, the vacuum 

insulated pipe system can be “started up” per the 
recommended process 

Operation

•  During normal operation, the APPS 160 will function 

automatically 

•  The liquid level switch will monitor the liquid nitrogen 

level. It will open and close the fill valve to maintain the 

liquid nitrogen level within the preset level 

•  The vent regulator will release gas as required to maintain 

the APPS unit at the preset pressure 

•  The pressure switch will monitor the pressure  If the 

pressure rises above the set point, it will open the vent 
valve and release gas to reduce the pressure 

Caution!  The vent valve will open without 

notice. The venting gas will be 
cold and loud.

•  To take the APPS unit out of service turn the power 

switch to “OFF ” The APPS unit will still contain liquid 
nitrogen, therefore it will vent gas from the vent regulator 
and supply liquid nitrogen from the outlet until the unit is 
emptied 

Installation / Operation

Summary of Contents for APPS-160

Page 1: ...Part Number 11929931 Rev B 2014 Chart Inc Designed and Built by Chart Inc 407 7th Street NW New Prague MN 56071 USA 800 400 4683 Product Manual APPS 160...

Page 2: ......

Page 3: ...al 1 Terms 1 Acronyms Abbreviations 2 Safety 3 General 3 Nitrogen and Argon 4 Installation Operation 5 Installation 5 Start Up 5 Operation 5 Adjustments 6 Operating Pressure 6 Liquid Nitrogen Level 6...

Page 4: ...iv Table of Contents Product Manual APPS 160 Revision Log Revision Level Date Description B 07 25 2014 Convert to new layout and combine with manual PN 13428250 for 220V...

Page 5: ...e control on liquid use Mini bulk storage for under sized vacuum lines Low cost alternative to two bulk tanks Two operating pressure ranges available Stainless steel plumbing Product Manual The APPS 1...

Page 6: ...onyms abbreviations are used throughout this manual APPS 160 Adjustable Pressure Phase Separator dB Decibel GPM Gallons per minute Hz Hertz MAWP Maximum Allowable Working Pressure OD Outer Dimension P...

Page 7: ...posed to an atmosphere containing only 8 to 12 oxygen In this environment unconsciousness can be immediate with virtually no warning When the oxygen content of air is reduced to about 15 to 16 the fla...

Page 8: ...r sustain life Inhalation of high concentrations of these gases can cause anoxia resulting in dizziness nausea vomiting or unconsciousness and possibly death Individuals should be prohibited from ente...

Page 9: ...properly installed The APPS 160 unit should be purged with warm dry nitrogen gas prior to introducing liquid to ensure that the unit does not have moisture in the inner vessel Turn APPS unit power swi...

Page 10: ...ution To monitor adjustment power must be on and wires will be powered or hot Turn large brass hex nut In or clockwise will decrease set point Out or counterclockwise will increase set point Replace c...

Page 11: ...valve or over tightened valve bolts The bolts should not be tighter than 12 foot pounds and should be evenly torqued If the gasket between the bodies leaks it needs to be replaced Mark the location of...

Page 12: ...8 Product Manual APPS 160...

Page 13: ...ction 1 2 male 45 flare 1 2 male 45 flare 1 2 male 45 flare 1 2 male 45 flare Outlet connection 1 female MVE bayonet 1 female MVE bayonet 1 female MVE bayonet 1 female MVE bayonet Vent connection 1 2...

Page 14: ...Vessel PRV 100 psig 11915572 11915572 11915572 11915572 Vessel SRV 150 psig 11915581 11915581 11915581 11915581 Inlet piping RV 235 psig 1810062 1810062 1810062 1810062 Vent regulator 11756911 211058...

Page 15: ...11 Specifications Product Manual APPS 160 Inlet Check Valve Inlet Strainer Inlet Connection Control Box On Off Switch Fill Valve Indicator Light Vent Valve Indicator Light...

Page 16: ...ions Product Manual APPS 160 Control Box hot black wire connection Control Box neutral white wire connection Control Box ground green wire connection Liquid Level switch connections Liquid Level switc...

Page 17: ...13 Specifications Product Manual APPS 160 Pressure switch connections Pressure switch adjustments Control Box Electrical Schematic...

Page 18: ...14 Product Manual APPS 160...

Reviews: