SECTION 3
–
MAINTENANCE 3-3
Three Months
Oil Filter
Replace the oil filter element every three months.
Six Months
Air Operated Valve
1. Relieve system pressure. Remove the valve from the system and place it securely in a
vise.
2. Fully open the valve stem.
3. Remove the packing gland locking device.
4. Unscrew the packing gland and remove the packing gland and stem.
5. Remove the packing from the body. Note the packing and washer arrangement.
6. Replace the packing and place the packing and packing washers into the valve body.
7. Replace the stem and packing gland, tightening to the appropriate torque.
8. Replace the packing gland locking device.
Annually
Replace the High Pressure Filter, Cylinder Pressure Release Valve, and Rupture Disk.
Pump
Chandler Engineering recommends that the pump valve body be disassembled, cleaned and
rebuilt by our Service Department. A pump rebuild kit is available from Chandler
Engineering.
Heater
Chandler Engineering recommends that the heater be inspected and tested for insulation
breakdown and voltage leakage, which can lead to arcing on the cylinder wall. This
procedure requires the use of specialized test equipment. Insulation breakdown poses two
potentially hazardous conditions: electrical shock hazard to the operator and pitting of the
cylinder at the point of arcing. Chandler Engineering highly recommends that our Service
Department perform a series of tests on the heater at this time interval.
Thermocouple and Temperature Controller
Our Service Department can perform a calibration procedure using specialized
instrumentation to assure that temperature drift and inaccuracies, as a result of time and
usage, are compensated for, in order to keep your instrument compliant with API specs.
Summary of Contents for AMETEK 5617
Page 3: ......
Page 9: ...P 4 PREFACE This page is intentionally left blank ...
Page 23: ...5 2 SECTION 5 REPLACEMENT PARTS This page is intentionally left blank ...
Page 29: ...5 6 SECTION 5 REPLACEMENT PARTS This page is intentionally left blank ...
Page 31: ...6 2 SECTION 6 DRAWINGS AND SCHEMATICS This page is intentionally left blank ...
Page 32: ......
Page 33: ...CHANDLER ENGINEERING ...
Page 36: ...TB1 TB2 ...
Page 37: ...CHANDLER ENGINEERING ...
Page 38: ......