16.99 cm
6.69
TEST ACCORDING TO PRESSURE TEST PROCEDURE/REPORT #7200-1010-1061.
STAMP SERIAL NUMBER IN FIVE LOCATIONS AS SHOWN.
TOP VIEW
FRONT VIEW
F)
LEFT VIEW
at MAX. WORKING TEMPERATURE = 163
INTERNAL VOLUME OF CEMENT CHAMBER = APPROX. 417 cc
MAX. WORKING PRESSURE = 6.895 MPa (1000 psig, 68.95 bar, 68.05 atm.)
C (325
REVISIONS
ZONE
REV.
DESCRIPTION
DATE
APPROVED
D
ECN T5383; REPLACE 54-903-206 WITH C15793
6/13/13
DBL
1
30.48 cm
12.00
25.40 cm
10.00
A
A
B
B
C
C
SCALE:
S.O. NO.
D
C
B
A
A
B
C
D
1
2
3
4
5
6
7
8
8
7
6
5
4
3
2
1
E
F
E
F
.
VESSEL W/ STAND, CHA
.
D
1:1
1 of 2
D
7200-1010
06/10/05
06/10/05
06/10/05
DAH
REW
DAH
CHANDLER ENGINEERING
DATE
APPROVALS
DRAWN:
CHECKED:
ENGR.:
REV.
SHEET:
DWG NO.
TITLE
SIZE
THIS DOCUMENT AND THE DRAWINGS AND TECHNICAL DATA CONTAINED
HEREON ARE THE PROPERTY OF CHANDLER ENGINEERING COMPANY, L.L.C.
REPRODUCTION OR DISSEMINATION IN ANY FORM EXCEPT AS EXPRESSLY
AUTHORIZED BY THE OWNER IS FORBIDDEN. THE HOLDER AGREES TO RETURN
THIS DOCUMENT TO THE OWNER ON DEMAND.
49.96 cm
19.67
Dimensions shown in cm and (inches).
1
1
1
1
1
45.13 cm
17.77
TO REMOVE VESSEL FROM STAND:
RELEASE ALL PRESSURE FROM ALL PARTS OF VESSEL.
1.
ROTATE HAND KNOB CCW (COUNTER-CLOCKWISE) TO RAISE UPPER ARM.
2.
PULL PLUNGER KNOB OUT AND ROTATE 90 TO HOLD IT OUT.
3.
ROTATE UPPER ARM 90 , OUT OF THE WAY OF VESSEL.
4.
RAISE VESSEL SLIGHTLY FROM LOWER ARM, AND REMOVE FROM STAND.
5.
BEFORE FILLING VESSEL AND APPLYING PRESSURE, YOU MUST:
PLACE VESSEL IN PLACE ON THE LOWER ARM.
6.
ROTATE UPPER ARM 90 , OVER VESSEL.
7.
ROTATE PLUNGER KNOB UNTIL IT TIP DROPS DOWN INTO SLOT.
8.
ROTATE HAND KNOB CW (CLOCKWISE) TO LOWER UPPER ARM.
9.
TIGHTEN HAND KNOB SNUGLY BY HAND.
10.
Summary of Contents for AMETEK 7200
Page 10: ......
Page 16: ...2 2 SECTION 2 OPERATING INSTRUCTIONS Figure 1 Front Panel...
Page 38: ......
Page 48: ...5 2 SECTION 5 TROUBLESHOOTING GUIDE This page is intentionally left blank...
Page 50: ...6 2 SECTION 6 REPLACEMENT PARTS This page is intentionally left blank...
Page 52: ...6 2 SECTION 6 REPLACEMENT PARTS This page is intentionally left blank...
Page 65: ...CHANDLER ENGINEERING...
Page 66: ......