4-6 SECTION 4 - CALIBRATION
Suggested Recalibration Schedule
1.
Before each test, you should “zero” each t
ransducer via its software calibration screen
(as mentioned above): Pore Pressure, H
2
O Confining Pressure, Pore Pressure, H
2
O
Confining Flow Rate, and Gas Injection Flow Rate.
2. All the pressure, temperature, and flow rate measurements should be recalibrated, as
mentioned in the previous section, as often as you desire. Chandler Engineering
suggests recalibrating every 6 months.
Summary of Contents for AMETEK 7200
Page 10: ......
Page 16: ...2 2 SECTION 2 OPERATING INSTRUCTIONS Figure 1 Front Panel...
Page 38: ......
Page 48: ...5 2 SECTION 5 TROUBLESHOOTING GUIDE This page is intentionally left blank...
Page 50: ...6 2 SECTION 6 REPLACEMENT PARTS This page is intentionally left blank...
Page 52: ...6 2 SECTION 6 REPLACEMENT PARTS This page is intentionally left blank...
Page 65: ...CHANDLER ENGINEERING...
Page 66: ......