100679 - 24 iN. 2-STAgE SNOwbLOwER
ASSEMbLY
16
Cables
1. Cables are disconnected from each other and found on the
base of the snowblower (near the auger housing) and on the
upper handle.
2. Fold handle down backwards (it will require some force to
fold backwards) and connect SELF-DRIVE CONTROL HANDLE
CABLE (4-1) on the right, and AUGER CABLE (4-2) on the left.
(Fig. 4).
3. Insert wire clamps (4-3) together and pull to make sure they
are connected. (Fig. 4).
4–3
4–2
4–1
Figure 4
NOTiCE
The cables are preset by the factory. If you need to adjust
see ADJUSTING SELF-DRIVE CONTROL HANDLE CABLES or
ADJUSTING AUGER CONTROL CABLE for correct adjustments.
NOTiCE
In the process of operation, if the auger or drive control handle
is too loose, screw the bolt of part A to get a natural tension
station for the wire.
Check the slack of the tension and adjust accordingly. You
want to make sure that the tension on the lower side of the
snowblower has
1
⁄
4
-
3
⁄
8
in. (6.4-9.5 mm) of movement. If the
slack is greater than
5
⁄
8
in. (16 mm), please adjust. Proper
tension is important because you will want your snowblower to
move forward properly in heavy snowfalls.
Upper Handle
1. Fold the upper handle up, making sure the cables pull tight
(Fig 5).
NOTiCE
Do not bend the SELF-DRIVE CONTROL HANDLE CABLE (4-1)
and AUGER CABLE (4-2) bolts when folding upwards.
Figure 5
2. Connect the last 2 bolts (6-1), 2 washers (6-2) and 2 locking
knobs (6-3) on the top (Fig. 6). Fully hand tighten all four
locking knobs.
6–2
6–2
6–1
6–1
6–3
Figure 6