4
WIRING
Refer to the manual for complete wiring instructions.
Follow the instructions according to your application.
To reduce the risk of SEVERE INJURY or DEATH:
• ANY maintenance to the operator or in the area near the operator MUST NOT be performed until disconnecting the electrical
power (AC or solar and battery) and locking-out the power via the operator power switch. Upon completion of maintenance the
area MUST be cleared and secured, at that time the unit may be returned to service.
• ALL electrical connections MUST be made by a qualified individual.
To “BATT DC POWER”
input on control board
33AH BATTERIES
(IN SERIES)
7AH BATTERIES
(IN SERIES)
A
B
C
D
A
J15 Plug
B
Red wire for 33AH battery
connections
C
Black wire for 33AH battery
connections
D
White jumper wire for 33AH battery
connections
ITEMS NEEDED FOR
24V APPLICATIONS
A
Existing Jumper
(battery connections)
(solar panel
connections)
The remaining wires in the kit are not needed
for 24V applications.
To “BATT DC POWER”
input on control board
WIRE THE BATTERIES - 24V APPLICATIONS
(To Solar Panels)
(To Solar Panels)
Models: LA400CONTU, LA400VDC, LA500CONTU, LA500VDC, LA500, CSL24VDC, CSL24U, CSW24VDC, CSW24U (for models CSL24V
and CSW24V refer to the wiring instructions provided with the Solar Harness Kit [Model K94-36596]).