
C
Y
K
Tech
Page 17
4.2.4 Top Thread Installation-Hoisting Installation:
Installation on the tank, pool, cover plate and support is basically the same as
above.
After probe installation, the probe emission surface must be exposed from the
cover plate or waveguide and it shall not be in the cover plate or waveguide.
02.Put a gasket on the flange
4.2.5 Liquid Measurement:
(1) Flat-Top Tank
Normally, the flat-top tank has a short connecting pipe whose datum plane is the un-
dersurface of flange. Under the premise that the connecting pipe length is ≤60mm,
inner diameter is ≥100mm and inner wall is smooth and free of burr and bulges, the
measurement can be carried out if the emitting surface of installed probe is 3cm be-
low the flange undersurface.
Flange installation in a short connecting pipe
www.ceyeko.com
Summary of Contents for LUDP
Page 12: ...CYK Tech www ceyeko com Page 12...